Laserfiche WebLink
The following is an itemized list of permit by rule tiered permit violations that have <br /> not been addressed for METAL FINISHING SOLUTIONS - STOCKTON CA as of <br /> January 26, 2022. <br /> Open violations from July 20, 2021 inspection <br /> is accurate and up to date; <br /> (5)For off-site facilities,the waste analyses that hazardous waste generators have agreed to supply; and <br /> (6)where applicable, the methods which will be used to meet the additional waste analysis requirements for specific <br /> waste management methods as specified in sections 66265.193, 66265.200, 66265.225, 66265.252, 66265.273, <br /> 66265.314, 66265.341, 66265.375, 66265.402, 66265.1034(d), 66265.1063(d), 66265.1084 and 66268.7 of this <br /> division. <br /> (7)For owners and operators seeking an exemption to the air emission standards of article 30 in accordance with <br /> section 66265.1083: <br /> (A) If direct measurement is used for the waste determination,the procedures and schedules for waste sampling <br /> and analysis, and the results of the analysis of test data to verify the exemption. <br /> (B) If knowledge of the waste is used for the waste determination, any information prepared by the facility owner or <br /> operator or by the generator of the hazardous waste, if the waste is received from off-site,that is used as the basis <br /> for knowledge of the waste. <br /> CORRECTIVE ACTION: Provide a complete treatment system waste analysis plan to the EHD within 30 days. See <br /> the REGULATION GUIDANCE above for details needed in the waste analysis plan. The plan must include point of <br /> waste generation analytical data for all hazardous waste streams that are processed through the treatment system <br /> (rinse tanks 3,4,6,7,9,10,11 and clean out of the secondary containment under the processing line) . For example, <br /> for tank 3,the sample must be taken from the tank just prior to pumping the waste to the treatment system. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 3 of 3 <br />