Laserfiche WebLink
Underground Storage Tank <br />Secondary Containment Testing Report Form <br />All tests marked “Fail” and any repairs made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 5 of 5 <br />9. COMMENTS <br />87 & 91 Secondary Piping Failed at the Bravo Hubs in UDC 1/2 & 3/4. <br />UDC 5/6 Failed - Possible Conduit Penetration. <br />91 STP Sump Increased. Adjust / Compensate for Increase. Block for Wind; Eliminate Potential Vibrations; Adjust for <br />Traffic; Adjust for Testing Probe - Retested and Passed. <br />Inspector Shewit Woldearegay Present.