My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 4:57:03 PM
Creation date
1/31/2022 8:34:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
ARCO CHEROKEE GAS & MART
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cherokee Arco <br /> 900 S . Cherokee Ln . Lodi CA . 95240 <br /> Veeder- Root Installation Scope of Work July 5th, 2022 <br /> Veeder Root Installation . <br /> Pull all required Air Quality and Environmental Health permits . <br /> • Pull all electrical and conduits from old tank monitoring system . <br /> Remove old tank monitoring system and associated equipment . <br /> Route all sensor and power to new Veeder Root location . <br /> • Mount Veeder Root and run conduits and electrical into unit . <br /> • Install latest ECPU2, software, and Enhancement Module . <br /> • Install probe modules, interstitial sensor modules, smart sensor modules and output <br /> relay modules . <br /> • Hand program System Setup, Communication Setup , InJank Setup , Liquid sensor setup , <br /> Pump Sensor Setup, Output Replay Setup, Smart Sensor Setup, and EVR/ ISD Setup . <br /> • Program per sites setup instructions, if supplied . <br /> • Install RS232 module and TCP/ IP card . <br /> • Configure network parameters for network cards . ( Site specific ) <br /> • Install Veeder Root EDIM and connect to POS . <br /> • Remove old tank probes and replace with Veeder Root Mag Plus probes and float kits . <br /> • Remove old STP sump sensors and replace with Veeder Root 208 sensors . <br /> • Remove old annular tank sensors and replace with Veeder Root 420 sensors . <br /> Saw cut concrete from building to 4 dispenser island locations . (Customer will have another <br /> contractor complete) <br /> • Direct bury Veeder Root approved Beldon cable to 4 dispensers for ISD communication . <br /> Seal over cable in concrete and into side of dispensers and at electrical trough at building . <br /> • Remove old flow meters, pressure sensors, and replace with Veeder Root Vapor Flow <br /> Meters and pressures sensor . <br /> • Pre -test all sensors for audible , visual , and shutdown . <br /> • Grade Map all hoses into Veeder Root and test ISD communication . <br /> • Commission Veeder Root and complete WRACO form . <br /> • Complete startup testing with Air Quality and Environmental Health department . <br /> Notes & Exclusions . <br /> Startup will not include troubleshooting other electricians wiring issues . <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.