My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
3443
>
2300 - Underground Storage Tank Program
>
PR0542573
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2023 11:17:00 AM
Creation date
1/31/2022 8:36:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0542573
PE
2351
FACILITY_ID
FA0024482
FACILITY_NAME
ADELFO'S ARCO AM/PM
STREET_NUMBER
3443
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
13206001
CURRENT_STATUS
01
SITE_LOCATION
3443 CHEROKEE RD
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: CHEROKEE ARCO–3443 CHEROKEE RD STOCKTON <br /> . . . . . . . . . . . VR . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . C-STORE <br /> . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . .�. �. .�. . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> ICY <br /> . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR Sensor <br /> . . . . . . . . . . . . . . . . .� . . = . .j. . .=. . . . F–FILLS <br /> V=VAPOR <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P=PROBE <br /> L=Turbine/Leak Detector <br /> 87 91 X=SUMP SENSOR <br /> B <br /> A =Brine Sensor <br /> S=Smart Sensor <br /> S T S T . . . . . . . . . . . . . . . . . . . . . . . . C=Floats&Chains <br /> P X X . . . . . . . . . . . . . . . . . . . . . . . . . . E=E Stop <br /> O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> DSL <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . *PIPING* <br /> X O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . exitDrawing furn pang <br /> O exit of sump and <br /> UDC's.No <br /> underground <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . drawing is <br /> S Taccurate,we <br /> OX . . . . . . . . . . . . . . . . . . . . . . . . . . . . cannot speculate <br /> A blue prints. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . U <br /> A*-immsUisiblssorim cer7t(img lnicimraeQ <br /> Frv065si 3ep—or{y--d—sda{t.fri*? np-F—P—iru <br /> rni to scde <br /> Date map was drawn:12/21/2020 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping.Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.