Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for ADELFO'S ARCO AM/PM as of February 14, 2022. <br /> Open violations from December 28, 2021 inspection <br /> Violation#319-Failure to comply with overfill prevention equipment requirements. <br /> OBSERVATION: The mechanical flapper used as the overfill prevention system is not currently functional on the 87 <br /> UST. <br /> REGULATION GUIDANCE:All UST systems must be equipped with an approved,functional overfill prevention <br /> device at all times during delivery operations. <br /> CORRECTIVE ACTION: Immediately discontinue deposition of petroleum into this tank until the component is <br /> repaired or replaced by a properly licensed, trained, and certified contractor under permit and inspection of the EHD. <br /> If the failed component can't be replaced immediately,there is a possibility that the 87 UST system may be red <br /> tagged to prevent fuel inputs. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 3 of 3 <br />