Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN —PAGE 1 (ane form per facility) <br /> TYPE OF ACTION ❑ I.NEW PIAN ❑ 2_CHANGE OF INFORMATION ROL <br /> I. FACILITY INFORMATION <br /> FACILITY ID# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) R02. <br /> ADELFO'S ARCO AM/PM <br /> BUSINESS SITE ADDRESS R03. CITY 804- <br /> 3443 CHEROKEE RD STOCKTON <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> ➢ If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-off,etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain die hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> ➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.1 l finds that <br /> it is non-hazardous. Used absorbent material,reusable or waste, will be stored in a properly labeled and sealed container_Waste material shall be disposed <br /> appropriately_ <br /> ➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br /> hazardous material.If the water is contaminated,it will be managed as hazardous waste unless a waste determination in accordance with 22 CCR§66262.11 finds <br /> that it is non-hazardous. If the water has a petroleum sheen(i.e.,rainbow colors),it is contaminated. A thick floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc.will not be disposed to storm water systems_ <br /> ➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material, other than the producdwaste stored in the primary containment system,is placed inside secondary containment to treat or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br /> equipment is inspected at least monthly.and after each use,supplies are replenished as needed. Defective equipment is repaircd or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete only if a licable) <br /> EQUIPMENT LOCATION AVAILABILITY <br /> RIO. tt20. RM. <br /> R11. 821. R31. <br /> ii12. 8222 R32. <br /> R13. R23, R33. <br /> R14. R24. R34. <br /> P, 825. 835. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(5)iS/ARF.RMPONSIRI,E FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40- TITLE P-W <br /> CARL NAHIGIAN CFO <br /> NAME R41. TITLE RSl- <br /> NAME R42. TITLE R52. <br /> NAME R43• TITLE F.51 <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional system testing or data collection MInspection by qualified persons ❑Recalibration of equipment <br /> Other: <br /> R60. <br /> UST Response Plan(13/2010)-1I3 <br />