My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON
>
1329
>
2300 - Underground Storage Tank Program
>
PR0231487
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2023 8:21:50 AM
Creation date
1/31/2022 8:47:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231487
PE
2351
FACILITY_ID
FA0000293
FACILITY_NAME
Pershing Holdings, Inc. DBA Esclon Arco
STREET_NUMBER
1329
STREET_NAME
ESCALON
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22510003
CURRENT_STATUS
01
SITE_LOCATION
1329 Escalon Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SA N. j 0 A U U I N Environmental Health Department <br />—COUNTY— <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YESA NO [ ] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training <br />certificates for each person installing or testing any component that is repaired or replaced. Ensure a copy of <br />the "Site Health and Safety Plan" is available on the jobsite as required by Title 8. <br />3. <br />Detailed description of work to be completed. List components to be repaired or replaced and attach a <br />diagram drawn to scale showing location of repairs and/or replacements. If repairing a component, describe <br />how this will be done. (If adding piping, UDC's, or other UST equipment, or performing tank top upgrade, <br />use the UST Installation Application pages 4-8 as necessary for a timely plan review): <br />4. List of equipment tCo be used (Attach manufacturer's specification sheets showing third -party approval): <br />6" �� <br />7-,necj c2, + i�l�i <br />:> <br />5. Decontamination Procedures: <br />a. Will piping be decontaminated prior to removal? <br />b. Identify contractor performing decontamination: <br />�E1ii1! <br />Address <br />3of6 <br />Phone (� <br />City <br />Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.