Laserfiche WebLink
Geocon will retain Cascade Drilling (C57# 938110) and McMillan's Well Service, LLC. for the well <br />destruction activities. Prior to destruction activities, the pump assembly will be removed and disposed of <br />properly. The field staff will note the material of the casing, measure the diameter of the well, depth to <br />groundwater, and total depth of the well. Measurements will be used to confirm specifications for wells <br />that have well construction records. Measurements from wells with unknown specifications will be used <br />to create well specifications. At each well, Cascade will perforate the well casing using depth -discrete <br />explosive charges packed with projectiles. Explosive charges connected to detonating cord will be placed <br />from the bottom of each well casing to the surface at 10 -foot intervals. After the explosive charges are <br />placed, a neat cement grout will be pumped into each well to the surface with tremie pipe. When the <br />grout level stabilizes in each well, the charges will be detonated perforating the well casing and permitting <br />neat cement to enter into the formation. Following blast perforation, additional grout will be added to <br />each well as necessary. The following table summarizes the approximate amount of explosives and grout <br />required for each well. <br />Well ID <br />Diameter <br />(in) <br />Estimated <br />Total Depth <br />(ft bgs) <br />Estimated /�s??ount of <br />Charges Required <br />Approximate Initial Grout <br />Volume <br />(gallons) <br />495 <br />_.._.._ _._.... <br />- _ 8 <br />_ 175 <br />17 <br />- - ---- --.......... <br />456 ........... _. <br />11717 <br />6 <br />170 <br />17 ............ .-- - <br />-.--... . ......... 249 <br />17737 <br />-_... ........ <br />_ . _............. 6 <br />55 ....... _._... <br />5 <br />....... ...... _.... _......... _.. _. _ ..._._ ..... <br />80 <br />__............ _.. ........ _...... .... _.._ _ .............. <br />17821 <br />..... ....... _ _...... ..... <br />.._._ . 6 <br />115 _.._ ........_.. <br />11 <br />.. .....-- ....................... <br />168 <br />... _...... .. ............... . _ _ .... .. ......... <br />17904 <br />5.5 <br />69.6 .. <br />6 <br />_..._ _ _ _.. -_ ..._..__.._..- -- --- <br />85 _. <br />- . _....._.._._...... _ .. - - ............ -.._........... _................ <br />..... <br />17926 <br />4.75 <br />69 <br />6 <br />_ _........ ....... ..._._ _._............... _._ <br />...... 63 <br />........... .._. _ ................ _.......... <br />-.1_....._.__.- . - <br />- -._--....._.._ <br />17933 <br />5.5 _ <br />83 <br />.I .................... 8 <br />.__.__ ............. <br />102 <br />......... ... ............ ...... .................... ........... <br />17950 ...__....... . <br />6 <br />- . --_._. ......... <br />59 <br />5 <br />--•---. _ . ... ....... ....... . <br />86 <br />......... .............. .............. ........ ..... ... _.............. <br />17793 <br />.Unknown <br />Unknown <br />.. - -- <br />._.. <br />1. __._.._._...... <br />17850 _. <br />........ __.............._......_._.......__ <br />Unknown <br />__.._._...__._...........— .._..- <br />Unknown <br />_ . _........... -- <br />17883 ... <br />Unknown <br />-................ -.... ----......... _.... <br />.. . Unknown <br />1 charge per 10 feet of well <br />5.8 gallons of grout per <br />17899 <br />Unknown <br />..---_..._._.._..I.......... ........ <br />Unknown <br />-...................... __..._.. <br />depth <br />cubic foot of well volume <br />._..................... _. <br />17911 <br />......................_._.............. ......... <br />.......... <br />Unknown <br />..._........ _...... _._............ .......... _ <br />... .... <br />Unl<nown <br />2145 <br />Unl<nown <br />Unknown <br />Geocon Project No. S 1358-03-05 - 2 - June 13, 2019 <br />