My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0039730
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
147
>
4200/4300 - Liquid Waste/Water Well Permits
>
WP0039730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2022 2:19:53 PM
Creation date
1/31/2022 1:37:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
WP0039730
PE
4373
STREET_NUMBER
147
Direction
N
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95337-
APN
19817023
ENTERED_DATE
6/18/2019 12:00:00 AM
SITE_LOCATION
147 N AIRPORT WAY
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geocon will retain Cascade Drilling (C574 938110) and McMillan's Well Service, LLC. for the well <br />destruction activities. Prior to destruction activities, the pump assembly will be removed and disposed of <br />properly. The field staff will note the material of the casing, measure the diameter of the well; depth to <br />groundwater, and total depth of the well. Measurements will be used to confirm specifications for wells <br />that have well construction records. Measurements from wells with unknown specifications will be used <br />to create well specifications. At each well, Cascade will perforate the well casing using depth -discrete <br />explosive charges packed with projectiles. Explosive charges connected to detonating cord will be placed <br />from the bottom of each well casing to the surface at 10 -foot intervals. After the explosive charges are <br />placed, a neat cement grout will be pumped into each well to the surface with tremie pipe. When the <br />grout level stabilizes in each well, the charges will be detonated perforating the well casing and permitting <br />neat cement to enter into the formation. Following blast perforation, additional grout will be added to <br />each well as necessary. The following table summarizes the approximate amount of explosives and grout <br />required for each well. <br />Well ID <br />495 <br />__......... I.............I <br />11717 <br />17737 <br />17821 <br />17904 <br />17926 <br />17933 <br />17950 <br />17793 <br />17850 <br />17883 <br />17899 <br />........................... <br />17911 <br />2145 <br />Estimated Amount of <br />Charges Required <br />1 charge per 10 feet of well 5.8 gallons of grout per <br />depth cubic foot of well volume <br />Geocon Project No S1358-03-05 - 2 - June 13, 2019 <br />Estimated <br />Diameter <br />Total Depth <br />(en) <br />(ft bgs) <br />8 <br />- .._._.._ __ _--......_ <br />175 <br />_..-.................. ................_........... . <br />_6 __. <br />170 <br />............................. <br />............ __------- ... <br />6 _...... . ...................................................................... <br />-- - ....... ........ <br />55 <br />6 <br />............. --.I .....................-- <br />115 ._ <br />------ ....................... _.._...... <br />5.5 <br />---.... .... ................... _._ <br />69.6 <br />............. _............ .._...... _.... ........ _... <br />4.75 <br />69 <br />5.5 <br />- ._..._ ..... <br />............... _ _.... . <br />83 <br />....... ... _ ............._.....__._........ <br />6 <br />59 <br />Unknown <br />Unknown <br />............ .I........... <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />UIIknoWII <br />Unlulown <br />Unknown <br />_.....I ......... ............_.. <br />Unknown <br />._._............. _......... _.... _......... <br />Unknown <br />Unknown <br />Estimated Amount of <br />Charges Required <br />1 charge per 10 feet of well 5.8 gallons of grout per <br />depth cubic foot of well volume <br />Geocon Project No S1358-03-05 - 2 - June 13, 2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.