Laserfiche WebLink
A hole of at least one foot larger than the diameter of the originally drilled hole will be excavated around the <br />outside of the well casing to a depth of 3 feet. The exposed well casing will be cut off approximately 6 inches <br />above the bottom of the excavation. The excavation will be backfilled with neat cement grout to one foot <br />above the cut-off well casing. Backfill material will match the existing surface after the grout has set. <br />Sincerely, <br />GEOCON CONSULTANTS, INC. <br />Lauren E. Short <br />Senior Staff Geologist <br />Attachments: Figure 1, Vicinity Map <br />Figure 2, Site Plan <br />Well Destruction Permits <br />Explosive Contractor License <br />Geocon Project No. S 1358-03-05 - 3 - June 13, 2019 <br />