My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0084274_SSCRPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODSON
>
3212
>
2600 - Land Use Program
>
SR0084274_SSCRPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:57:46 PM
Creation date
2/1/2022 2:45:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSCRPT
RECORD_ID
SR0084274
PE
2602
FACILITY_NAME
3212 E WOODSON RD
STREET_NUMBER
3212
Direction
E
STREET_NAME
WOODSON
STREET_TYPE
RD
City
ACAMPO
Zip
95220
APN
00514531
ENTERED_DATE
9/27/2021 12:00:00 AM
SITE_LOCATION
3212 E WOODSON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 25, 1999 <br />The Closure Plan arrived today without fees. Briggs called and spoke to Mrs. Marsili, Briggs <br />explained how important the plan was and stated that it could not be reviewed until tank Closure <br />fees were received. Briggs told Mrs. Marsili the tank is considered illegally abandoned. <br />February 2, 1999 <br />Closure Plan fees were received. <br />February 8, 1999 <br />Briggs requested that Treveria document his December 1998 conversaWn Vft Eugene Marsili, <br />Trevena made an entry on the Narrative sheet for December 1998. <br />February 22, 19919 <br />Briggs reviewed the Closure Plan for LIST #1 — 4000 gallon diesel tank, and reviewed the file to <br />determine the diesel tank history, (There is no monitoring information in the file). This tank was <br />never precision tested. The Closure Plan lacks: 1) Plot Plan with septic tank, leach fields, water <br />wells and building locations, 2) Name of soil sampler, 3) Authorization to Release with laboratory <br />name, 4) Completed Page #10 UST Tracking Record, 5) Site Health & Safety Plan, and 6) A <br />completed backfill certificate. As a result, the Closure Plan was incomplete. <br />Briggs called the owner, Eugene Marsili and explained his options. He needed to complete the <br />Health & Safety Plan. He could also triple rinse the UST of have the tank hauled as hazardous. <br />Briggs left the incomplete Closure Plan and Site Safety Plan (example) downstairs at the EHD <br />counter for him to pickup. <br />March 3, 1999 <br />Briggs received the completed Closure Plan. <br />March 6, 1999 <br />Briggs conditionally approved the Closure Plan, Thorpe oil will decontaminate/haul the tank. <br />March 10, 1999 <br />Briggs went out to do an inspection for tank closure and laboratory soil sampling. Briggs spent I <br />hour traveling, and 1 hour awaiting soil sampler on site, The soil sampler did not come so Briggs <br />left and awaited a call to return for sampling, <br />Briggs received a call from Eugene Marsili requesting she return to M & M Harvesting to witness <br />sampling under the east and west end of the tank. The soil sampler arrived late. Briggs witnessed <br />sampling under the east and west end of the tank and stockpile. No piping samples were required <br />as the dispenser is located over the tank. Briggs spent I hour for the inspection and 1 hour <br />traveling. <br />As per Eugene Marsili, Thorpe Oil is to rinse and haul tank from site tomorrow. <br />April 22, 1999 <br />Briggs reviewed the file for closure information. The tank tracking record, rinsate manifest, soil <br />sample results, and Tank Certification had not been received. <br />Briggs called M & M and spoke to Eugene Marsili, He stated he would send the jr#Qrmation ASAP. <br />Briggs called Thorpe Oil. As per Rich Thorpe, he was holding the rinsate manifest and tank 004 <br />paperwork until he got paid. <br />This site was out of compliance. The closure was incomplete. <br />August 17,1999 <br />Briggs received incomplete laboratory soil sample results from Marsili (lacking east end of the tank <br />sample results). Briggs called Marsili Brothers and was told to call back later. As per Doug Wilson, <br />proceed with the 0, A. case, <br />
The URL can be used to link to this page
Your browser does not support the video tag.