Laserfiche WebLink
e . A request for fire flow shall be submitted to the South San Joaquin County Fire Authority <br /> and results shall be approved by the Fire Marshal prior to construction . Fire flow <br /> requirements shall be in accordance with CFC Appendix B . <br /> f . Fire department connections shall be installed in accordance with CFC § 912 and NFPA <br /> standards . A hydrant shall be placed within 100 ' of the FDC, in accordance with NFPA 14 <br /> § 6 . 4 . 5 . 4 . FDC locations shall be approved by the fire code official prior to issuance of <br /> construction permit . <br /> g . When a facility stores or uses hazardous materials , the fire code official may require the <br /> installation of a secured box manufactured by KNOX and located at the facilities primary <br /> entrance of the building . The plan box shall contain up - to - date hazardous materials <br /> inventory sheets ( HMIS ) of all of the hazardous materials stored or used within the facility, <br /> hazardous materials management plan ( HMMP ) and contact information of the company <br /> liaison to the fire department . The plan box shall be water proof and of sufficient size to <br /> contain HMMP and HMIS information without the need to fold the documentation . <br /> 2 . Applications received by our offices are subject to the current fee schedule for South San Joaquin <br /> County Fire Authority . <br /> a . Application processing fees and minimum plan review fees are due at time of submittal of <br /> construction documents . <br /> b . Additional plan review fees , minimum inspection fees and administrative fees are calculated <br /> on approval of project and shall be paid prior to issuance of permit . <br /> c . Permit holder is responsible for any additional inspection fees incurred , and shall be paid <br /> prior to final inspection . <br /> 3 . Prior to occupancy of each new business , the tenant shall contact South San Joaquin County Fire <br /> Authority for a new business inspection . Additional fees may be required for New Business , Annual <br /> and Operational Fire Permits . All fees shall be paid prior to approval of inspections . <br /> 4 . Prior to construction , all - weather fire apparatus access roads shall be installed . Fire apparatus <br /> access roads during construction shall have a minimum 20 ' unobstructed width in accordance with <br /> CFC § 503 . <br /> 5 . All hydrants shall be installed , inspected and tested prior to bringing combustible materials onsite , <br /> including storage . <br /> 6 . Knox boxes shall be required . The operator of the building shall immediately notify the Fire <br /> Authority and provide the new key where a lock is changed or rekeyed . The key to such shall be <br /> secured in the key box . <br /> 2 <br />