Laserfiche WebLink
U . S . Department of Homeland Security <br /> FEMA Region IX <br /> 11 I 1 Broadway, Suite 1200 <br /> Oakland, CA . 946074052 <br /> r�oA <br /> 4 y <br /> FEMA <br /> �VIVDS �� <br /> February 15 , 2022 <br /> Alisa Goulart , Project Planner <br /> San Joaquin County <br /> Community Development Department <br /> 1810 E . Hazelton Avenue <br /> Stockton , California 95205 <br /> Dear Ms . Goulart : <br /> This is in response to your request for comments regarding Application Referral Application <br /> Number PA 2100275 ( SA ) , Early Consultation , (APN/Address : 250 - 15046 , - 17 , - 18/7500 W . <br /> Eleventh Street , Tracy ) ( Supervisorial District 5 ) . <br /> Please review the current effective Flood Insurance Rate Maps ( FIRMS) for the County of San <br /> Joaquin ( Community Number 060299 ) , Maps revised October 20 , 2016 , and City of Tracy <br /> ( Community Number 060303 ) , Maps revised October 16 , 2009 . To locate FIRMs online , visit <br /> the Map Service Center ( MSC ) at https : //msc . fema . gov , Please note that the City of Tracy , San <br /> Joaquin County , California is a participant in the National Flood Insurance Program (NFIP) . The <br /> minimum , basic NFIP floodplain management building requirements are described in Vol . 44 <br /> Code of Federal Regulations (44 CFR) , Sections 59 through 65 . <br /> A summary of these NFIP floodplain management building requirements are as follows : <br /> 0 All buildings constructed within a riverine floodplain , ( i . e . , Flood Zones A . AO , AH , AE , <br /> and Al through A30 as delineated on the FIRM ) , must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map . <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM , any development must not increase base flood elevation levels . The term <br /> development means any man - made change to improved or unimproved real estate , <br /> including but not limited to buildings , other structures , mining , dredging , filling , <br /> grading , paving , excavation or drilling operations , and storage of equipment or <br /> materials . A hydrologic and hydraulic analysis must be performed prior to the start of <br /> development and must demonstrate that the development would not cause any rise in <br /> base flood levels . No rise is permitted within regulatory floodways . <br /> www. fema . gov <br />