My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2022 9:02:12 AM
Creation date
2/2/2022 1:36:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />8. Ifs -TANK GAUGING TESTING <br />j <br />Z Check this box if tank gauging is used only for inventory control. <br />Q Check this box if NO tank gauging equipment is installed. <br />Do not complete this section if either box is checked. <br />Yes <br />No <br />NA <br />All wiring has been: 1 j visually inspected for kinks, breaks and proper entry and <br />termination; and 2) tested for ground faults? <br />❑ <br />❑ <br />❑ <br />Were all in -tank gauging probes visually inspected for damage and residue buildup <br />to ensure that floats move freely, functional!y tested. and confirmed operational? <br />❑ <br />❑ <br />I ❑ <br />Was accuracy of system's product level readings tested? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />❑ <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑ <br />❑ <br />❑ <br />Probe ID <br />Probe Model <br />Tanks Monitored <br />Pass <br />Fara <br />❑ <br />Lj <br />❑ <br />❑ <br />❑ <br />❑ <br />Q <br />Q <br />❑ <br />❑ <br />❑ <br />❑ <br />9. COMMENTS <br />Describe all answers marked "No' or ''Fail" and proposed remedy. <br />List all monitoring equipment either replaced or repaired. <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.