Laserfiche WebLink
f\L�F,ly al! ` !!I Delete )uk K. ujtjt.,, <br />208118 M/C not submitted within the required 30 days G internal <br />Q Label: Age (3 years) Expires: Sun 1/26/2025 11:36 AM <br />Tamamian, Maurice [Chevron Stations Inc.] <br />Thu 1/27/2022 11:36 AM <br />To: Vargas, Vivian [Chevron Stations Inc.]; USCS11731 <br />Cc: Tamamian, Maurice [Chevron Stations Inc.] <br />Hello inspector. <br />It is not in Chevron's intention to miss the deadline on submitting test results within the required time <br />frame. Unfortunately, our testing contractor had issues with the test results in their system and it was <br />submitted Late. We had a conversation with our testing contractor that this is not acceptable. Chevron <br />always strives to have all testing results submitted within required tame frames and will continue to do <br />so. <br />Please feel free to contact me should you have any questions. <br />Thank you, <br />Maurice Tamamian <br />UST Compliance Coordinator <br />Americas Fuels and Lubricants <br />6001 Bollinger Canyon Road <br />San Ramon, CA 94583 <br />Mobile: 310-923-6388 <br />Email: mrct(a)chevron.com <br />JAN 2 7 2022 <br />This e-mail transmission, and any documents, files or• e-mail messages attaclTed to it, rrra}� contai�i contrdentinl <br />it?formation drat is atorney work product or legally privileged. If :you cme nol the intended recipient, or the, person <br />responsible for delivering it to the intended recipient, you are hereby notified that any disclosure, copying; <br />distribution or use of miy of the information contained in or attached to this transmission is STRICTLY <br />PROHIBITED. f'you have received this t4ansrnission in error, please notify me immediatel}; and destroy the <br />original transmission and its attachments without reading thein. <br />Reply Reply all Forward <br />about:blank 1t1 <br />