Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for MANTECA CHEVRON as of February 02, 2022. <br /> Open violations from May 19, 2021 inspection <br /> Violation#107-Failure to submit and maintain complete and current financial responsibility documents. <br /> OBSERVATION: Financial responsibility documents have not been submitted to the EHD. <br /> REGULATION GUIDANCE: Current financial responsibility documents are required to be submitted annually. <br /> CORRECTIVE ACTION: Immediately log into the California Environmental Reporting System (CERS)at <br /> http://cers.calepa.ca.gov/, and upload the required documents. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#208-Failure to comply with the designated operator inspection requirements. <br /> 1)OBSERVATION:The designated operator failed to check and note all required items on the visual inspection <br /> reports.The incorrect and missing information included the following from the inspection reports: <br /> -The DO(designated operator)reports of 5/27/2020, 8/28/2020, 09/24/2020,10/22/2020 , 2/11/2020,12/17/2020 and <br /> 3/12/2021,the OWNER/OPERATOR failed to provide a name, signature, and date within the time frame of <br /> receiving the DO report under the ACKNOWLEDGMENT OF COMPLIANCE ISSUES section. <br /> -The DO report of 01/14/2021, did not include the owner/operator name. <br /> Te DO report of 02/11/2021 and 3/12/2021 left the follow up section from previous inspection blank. <br /> REGULATION GUIDANCE: During the visual inspection,the designated operator shall check that all required <br /> testing and maintenance for the UST system have been completed and shall check all required items on the report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing visual inspections at this facility are including <br /> all of the required information on the reports. <br /> 2)OBSERVATION:The designated operator inspections for the following months were performed more than 30 <br /> days after the previous inspection: <br /> - Initial inspection on 05/27/2020, next inspection performed on 8/28/2020(93 days)between the two dates. <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 1 of 2 <br />