My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:20 PM
Creation date
2/3/2022 3:57:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 91-2 <br /> Are both vent and tank riser piping r] Yes r] Yes © Yes © Yes <br /> secondarily contained? ® No r] No r] No © No <br /> OPE Model <br /> What is the OPE response when Shut off 0 Shut off 0 Shut off 0 Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts ORestricts © Restricts © Restricts <br /> Flow Flow Flow Flow <br /> © Audible 0 Audible 0 Audible rl Audible <br /> Alarm Alarm Alarm Alarm <br /> © Visual 0 Visual ❑t— Visual 57 Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* r] Yes* r] Yes* © Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No © No <br /> At what level in the tank is the OPE set to <br /> $2.75" <br /> activate? Inches from bottom of tank) <br /> What is the percent capacity of the tank at 94.00% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes 17 Yes* © Yes* 0 Yes* <br /> respond when the stored substance © No 0 No © No © No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass © Pass ❑I� Pass 0 Pass <br /> Q Fail ❑I— Fail © Fail 0 Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Fill riser is direct bury.Vent piping is Single wall. <br /> * Mark here if: <br /> 0 Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.