Laserfiche WebLink
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1-91/1 T2-91/2 T3-87 T4-DSL <br /> Are both vent and tank riser piping © Yes 0 Yes © Yes 0 Yes <br /> secondarily contained? ® No ® No ® No ® No <br /> OPE Model 71 SO 61 SO 61 SO 61 SO <br /> What is the OPE response when ® Shut off IT Shut off ® Shut off Shut off <br /> activated? Flow Flow Flow Flow <br /> (Check all that apply.) © Restricts EI Restricts © Restricts 0 Restricts <br /> Flow Flow Flow Flow <br /> © Audible © Audible FM Audible 0 Audible <br /> Alarm Alarm Alarm Alarm <br /> El Visual © Visual [M Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes* Yes* Yes* Yes* <br /> that may interfere with the OPE operation? ® No ® No ® No ® No <br /> At what level in the tank is the OPE set to <br /> 82 1/2" 82 3/4" 79" 77" <br /> activate? Inches from bottom of tank) <br /> What is the percent capacity of the tank at 91,82% 94% 88.5% 86.37% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ® Yes ® Yes* ® Yes* ® Yes* <br /> respond when the stored substance © No © No 0 No 0 No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> OPE Inspection Results ® Pass ® Pass ® Pass ® Pass <br /> Q Fail © Fail © Fail 0 Fail <br /> 8. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> ® Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />