0 <br /> 3 <br /> c <br /> LEGEND GENERAL NOTES C] KEY NOTES <br /> ' REMOVE CONCRETE DECK AND I. AS FIRST ORDER OF WORK, CONTRACTOR SHALL VERIFY 1. EXIS I <br /> NG BLEACHERS TO BE REMOVED AND STORED FOR REUSE. <br /> CANTILEVER UNLESS OTHERWISE 2, ACCESSIBLE LIFT DIVING BOARDS WATER o 0 <br /> EXISTING DECK 5 AI AN PRIOR TO ERP LD GOALS TO BE REMOVED AND <br /> E i • '' NOTED, SEE I/SP9•I R D GUTTER ELEVATIONS , <br /> a STORED FOR REUSE. <br /> U 2. DAMAGE TO THE EXISTING CONDUIIT 16 NOT EXPECTED DUE TO 3• ALL EXISTING FLOATING LANE LINES TO BE REMOVED AND STORED FOR REUSE. <br /> MODIFICATIONS TO THE LIGHTS AFTER THE POOL WAS 4• ALL STARTING PLATFORMS TO BE REMOVED AND STORED FOR REUSE.. <br /> Q EXISTING PLASTER AND TILE TO CONSTRUCTED. IF IN FACT THE CONDUIT IS DAMAGED DURING <br /> REMAIN UNDISTURIBED. WATER TO REMOVAL OF THE DECKS, NOTIFY THE ARCHITECT. 6, ALL BACK STROKE AND STANCHIONS AND FLAGS ARE To BE REMOVED AND <br /> Q REMAIN IN POOL DURING 1 0 STORED FOR REUSE. <br /> CONSTRUCTION. DROP BELOW THE 3'-0' LINE FOR AN EXTENDED AMOUNT OF 1 <br /> 8, TRENCH DRA1N GRATING TO BE REMOVED AND STORED FOR REUSE. <br /> w <br /> DAMAGE E O OISTIaAActoR MUST MAINTAIN WL To PREVENT � <br /> E R STAINING. 9. ALL LIFEGUARD CHAIRS TO BE REMOVED AND SCORED FOR REUSE. <br /> z EXISTING DSERYATION ROOM 4. LANE LINE AND POOL COVER REELS TO BE PROTECTED 10. J-BOXES TO BE REUSED, CONTRACTOR TO MINIMIZE DAMAGE OF CONDUIT <br /> SLAB TO REMAIN CONSTRUCTION. DURING DECK REMOVAL, <br /> il. J-BOXES AND TOMBSTONES To BE REUSED, CONTRACTOR TO MINIMIZE DAMAGE <br /> r <br /> 12. MAN HOLE, CONTRACTOR TO EXCAVATE W/ CAUTION TO PREVENT DAMAGE TO 01 EXISTIN STO WiTAINTIONWX <br /> ""' LIMIT OF UJORK G RM SYSTEM 4 POC. <br /> a DECK REMOVAL %T4 A OF Q Q <br /> I5. EXISTING STAIR HANDRAIL to BE REMOVED AND STORED FOR REUSE. <br /> 16, STAIRS TO REMAIN UNDISTURBED. P7CO . <br /> 0 <br /> � 141 C00 <br /> 11, EXISTING DECK TO REMAIN UNDISTURBED. <br /> I8. GATES MAY BE REMOVED DURING CONSTRUCTION. rV: 7CO 7U-1 <br /> Cl I <br /> 19. RAISE 8 SUPPORT BULKHEAD DURING CONSTRUCTION TO ALLOW FOR t�A <br /> DEMOLITION. CONTRACTOR t0 SUBMIT PROPOSED METHOD OF SUPPORTING <br /> BULKHEAD FOR APPROVAL. THE CONTRACTOR SHALL ALSO PROVIDE A COST �sED AROy <br /> FOR REMOVING THE BULKHEAD COMPLETELY AND REINSERTING ONCE ���� PAUL <br /> � l Ell S o c <br /> 20. EXISTING PA CONNECTION CONTRACTOR t0 MINIMIZE DAMAGE TO CONDUIT <br /> DURING DECK REMOVAL IT IS UNKNOWN IF CONDUIT IS PROPERLY BURIED �...�.. <br /> BELOW DECK. No. C15,022 <br /> 21. REPLACE 3'-O' OF BROKEN CONDUIT AT BASE OF J-BOXES. s�TxP 12/31/2013 <br /> 22, CONTRACTOR TO CONFIRM USE OF J-BOX 8 REPORT TO ARCHITECT. <br /> 23. CAP STAR GER LINES ONCE DECK IS REMOVEDZL <br /> 2013 <br /> 0 <br /> 0 98'•0' 111'-5�' <br /> a <br /> � 9 <br /> ------------ <br /> 1■■■- p.-� 1�• 1 O - .. <br /> V/ • , • • ' , • ....1..■ I �- I I I -� , I a.n.r I I ✓_- I I I I ,.Ili I i 1 �� I I ..w.-. I >•� I V I M.LW.W I I ,rte. I I ....II. <br /> D 1� 2 1� 1� N <br /> 1 t , . - ., 40 <br /> ui <br /> Lu <br /> LL <br /> Mail. f <br /> U 0 <br /> oam m m m=4 Yf= CL <br /> __ _ <br /> .. Ir— u <br /> V)^ . . <br /> < LLJ w 0 <br /> Lu <br /> V ❑ <br /> La . <br /> Of <br /> + <br /> I \ <br /> cu <br /> p iu <br /> N <br /> EXISTINGEu <br /> _ —.. POOL 8,113 SOFT - � <br /> i <br /> �; • •. <br /> , <br /> o <br /> : ` /may/ ♦, . . : ._ . ' . . . • = a a a a aC)L\ <br /> a <br /> Ap <br /> us <br /> Yl=. <br /> % J,X <br /> \ i it \ � <br /> 0 IX <br /> C 17771 <br /> I f <br /> Noe <br /> 01 <br /> I- V 'I J <br /> TYP. <br /> - • ' . , U <br /> o <br /> I. <br /> lidL.L. <br /> Q <br /> ' - — UU <br /> Q 0 <br /> - I 1 - 1 1 1 I !� I i♦- - 1 - I 1 - J I 0 0 V J < 1l <br /> .. W ���1.1111...444 <br /> o � U <br /> W Z < Lo0 <br /> 54 1 '- ' � C) m < m �U) 129 �0 9II _ � <br /> � 7) <br /> a <br /> u01 <br /> 201'-11' <br /> � Q m <br /> DEMOLITION PLAN � � Q Z Q n <br /> 17 <br /> cn 17 <br /> a" I'-0' © cn W o <br /> Q <br /> NORTH DRAWING N 0.: <br /> SPI = 0 <br /> t <br />