Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> Total Cont.=Total Containment. Dsl=Diesel. Compt.=Compartment. PS=Piping Sump. FRS=Fill <br /> Riser Sump. Western FG=Western Fiberglass. <br /> Note: Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump/Fill Riser Sump, prior to <br /> testing. <br /> Note: This UST Facility has combination Piping Sumps/Fill Riser Sumps. <br /> Note: Tank is a 20K, three compartment. Tank #1 is designated for 10K Regular 87 Octane <br /> Gasoline. Tank #2 is designated for 5K Super 91 Octane Gasoline. Tank 3 is designated for 5K <br /> Diesel. Tank#1, Tank#2, and Tank#3, have a common Tank Secondary Containment. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />