Laserfiche WebLink
2Co �► vc7 <br /> Oct, , C <br /> Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6 . OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) 87 91 Diesel <br /> Are both vent and tank riser piping r] Yes 0 Yes [] Yes IN Yes <br /> secondarily contained ? © No © No El No © No <br /> OPE Model 71SO 7150 7150 <br /> What is the OPE response when VShut off © Shut off Shut off d Shut off <br /> activated ? Flow Flow Flow Flow <br /> (Check all that apply. ) [] Restricts [] Restricts n Restricts [0 Restricts <br /> Flow Flow Flow Flow <br /> © Audible Audible © Audible © Audible <br /> Alarm Alarm Alarm Alarm <br /> © Visual © Visual © Visual Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping © Yes * El Yes* 0 Yes * ® Yes * <br /> that may interfere with the OPE operation ? ® No Q No © No © No <br /> At what level in the tank is the OPE set to <br /> 'I 03 .75 103 . 25 103 . 25 <br /> activate ? Inches from bottom of tank <br /> What is the percent capacity of the tank at 94 % 94 % 94 % <br /> i <br /> which the OPE activates ? ! <br /> Is the OPE in proper operating condition to El Yes © Yes * Yes * © Yes* <br /> respond when the stored substance © No Fn No © No © No <br /> reaches the designated regulatory level ? <br /> 7 . SUMMARY OF TESTING RESULTS <br /> ✓� Pass f✓ Pass Pass ❑r Pass <br /> OPE Inspection Results 0 Fail Fail © Fail © Fail <br /> 8 . COMMENTS <br /> Describe all answers marked "No " or "Fail' and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> * Mark here if: <br /> 0 Flow restrictors interfere with overfill prevention and equipment repairs required . <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In - Tank Setup report(s) <br /> Page 2 of 2 <br />