Laserfiche WebLink
Page 1 of 2 <br />Jennifer Frase [EH] <br />From: Huynh. My (MSA) [huynhm@sacsewer.com] <br />Sent: Monday, September 15, 2008 11:18 AM <br />To: Jennifer Frase [EH] <br />Subject: RE: Walnut Grave Sewer Project, Thornton <br />Attachments: Geotechnical Investigations at Booster PS.PDF <br />Hi Jenny, <br />The below message was sent to you last Friday. To ensure that you have received this email, I <br />will follow up this email with a phone call. <br />My Huynh <br />Sacramento Area Sewer District <br />9660 Ecology Lane <br />Sacramento, CA 95827 <br />(916)876-5371 <br />Hi Jenny, <br />Thank you for the phone discussion yesterday on the history and concerns of parcel 001-110- <br />34. In summary, Sacramento Area Sewer District is constructing a sewer booster pump station <br />on the subject parcel directly south of the cell tower. The pump station site is approximately <br />7,500 square feet and in escrow for purchase. The contractor working on the project has <br />excavated to a depth of 29 feet and has not seen soil inconsistent with our soil boring log. <br />For your information, attached is a copy of our geotechnical report containing the soil boring <br />log (Appendix B). In the mean time, I will see if we have any information showing the dewater <br />composition. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />My Huynh <br />Sacramento Area Sewer District <br />9660 Ecology Lane <br />Sacramento, CA 95827 <br />(916) 876-5371 <br />«Geotechnical Investigations at Booster PS.pdf>> <br />9/15/2008 <br />