Laserfiche WebLink
(Initial) Took Trainee to the TLM System. <br />(initial) Reviewed the site's specific type of TLM system (Vender-Root. In-Conn. etc.) <br />(initial) Discussed the equipment operating procedures (components & functions). <br />Alarm Reportind Procedures <br />(initial) Reviewed the Visual & Audible alerts. <br />(initial) Demonstrated process for silencing the audible alarm. <br />(initial) Reviewed the (2) categories of alarms (UST& ISD), Discussed the Quick Reference Aiarin Card and the means of <br />uishing a Vapor Alarm from an 1St) Alarm. <br />(initial) Reviewed the reporting process for Air Quality Alarms, i.e. record alarm in ISD Binder (tab 1). record in <br />nance Binder, and the timelines for reporting an Air Quality alarm to maintenance. <br />(initial) Reviewed the reporting process for UST Alarms, i.e. record alarm in the Maintenance Binder, and immediately <br />report alarm to maintenance. <br />4A <br />EMERGENCY RESPONSE/UST MONITORING ALARM TRAINING <br />Training Checklist <br />Employee Name FACILITY # <br /> :61105\cf-4- <br />ergency Response-Tools & Procedures <br />'Visually' pointed out and reviewed with the Trainee each of the following: <br />(initial) Spill Response items (Hydrocarbon Response Bags, extra pads, absorbent, broom & dust pan. MoGas spill <br />): explained spilt/overfills response, cleanup and reporting procedures Refer to the Designated Operator Training Curt:cave .. <br />(initial) Hazardous Waste Barrels: walked Trainee to location and explained procedures relating to their use, Le. purpose of <br />fferent barrels and procedures when depositing items in them. <br />(initial) Location of (an) Fire Extinguishers- (inside & outside): walked the Trainee to each one <br />(initial) Location of (all) Fire Alarm "Pull Stations"- if applicable: walked the Trainee to each one. <br />(initial) Location of (all) Emergency Shutoff switches - (inside & outside): walked the Trainee to each one <br />(initial) Electrical Service Main Breaker - Water Main Valves - (if applicable- Natural Gas Shutoff & Sprinkler Controls & <br />walked the Trainee to each one and explained how to access & operate them <br />(initial) Emergency Response Binder: reviewed 'air the documents in The binder and the procedures when evacuating. <br />(initial) Location of (all) CO2 (bulk or canisters), CO2 sensors, CO2 alarms with placard (backroorn and c-store) - <br />ed the Trainee to all CO2 equipment and expla,ned procedures relating to their use, i.e. purpose for sensor light and the different <br />alarms. Refer to *Designated Operator Training Curriculum <br />Reviewed and explained all the procedures for the following: <br />(initial) Steps to Shut-Down and Evacuate <br />(initial) First Aid Procedures for Exposure to Gasoline & Diesel <br />(initial) Small & Large Gasoline I Diesel spill and a non-gasoline vehicle-fluid spill cleanup procedure (Spilt Response <br />dares). <br />(initial) Site Specific Emergency Response & Training Plan <br />Hmee <br />UST Mon itorin System & Alarm RepfthigProcédures <br />Instructed the Trainee on the following: <br />Monitorinq Equipment <br />Trainee Signature .--- -- pi _ <br />:-.,,,;:,,------ _flog/ Date: ... ._ <br />Designated Operator Signature Atel& ea 8360137 Date: <br />File in employee station file only <br />Revised 5/23/20