Walin!f: Grove Ficvocr Prc&cL Loo;aLer i Imu a Soh -Moil <br />Our ProjecL WuEtzh _r: <br />May :L4, 200Y <br />pressures should be used for walls that are free to rotate at the top. The following <br />table presents the lateral earth pressures that may be used in the design of the wet <br />wells. <br />Lateral EarthPressure - <br />Condition <br />Equivalent fluid <br />pressure, above <br />groundwate <br />Equivalent fluid <br />pressure, below <br />groundlwater, pcf <br />At -rest <br />60 <br />90 <br />Active <br />40 <br />80 <br />Earthquake -induced <br />18 9 <br />For the section of the structure below the groundwater, we recommend an additional <br />equivalent fluid pressure of 19 pcf be used for the effects of hydrodynamic forces. This <br />is in addition to the lateral earth pressures listed above. The resultant of the <br />earthquake -induced lateral earth pressure force should be applied at a distance of 0.6 H <br />(H being the height of the wet well wall) above the base of the wet wells. <br />The above equivalent fluid pressures assume a granular backfill will be used against the <br />sides of the wet wells. <br />We understand a canopy structure will be Constructed over the electrical pad. The <br />canopy structure will be supported on drilled piers. The drilled piers can be designed as <br />friction piers. We recommend the drilled piers be designed using an allowable skin <br />friction value of 750 pounds per square foot per foot: of depth. The upper two feet of <br />subgrade soil should be neglected as providing any support to the drilled piers. The <br />drilled piers should be a minimum of 12 inches in diameter and extend a minimum <br />depth of 5 feet below the existing ground surface. If the piers extend below a depth of <br />8 feet, it will be necessary to case the pier or place concrete using the tremie method. <br />The concrete mix design should take into account whether or not the pier will extend <br />below the groundwater table. The drilled piers should be spaced at least 21/2 pier <br />diameters, center to center distance, The reinforcing for the drilled piers should be <br />provided by the structural engineer. <br />6.6 Testing, %nspectiorus and Revie <br />w <br />Our office should be afforded the opportunity of reviewing the completed foundation <br />and grading plans to verify that our recommendations have been properly interpreted <br />and incorporated. Unless our office is allowed this opportunity, we disavow any <br />responsibility from problems arising from failure to follow geotechnical <br />��� NEIL O. ANDERSON <br />AND'(ASIS)OCIA T ES <br />codc f�a 95a10 <br />02007 NO O. Anderson & Assodates. nc. <br />