My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1994-2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
29247
>
4400 - Solid Waste Program
>
PR0515733
>
COMPLIANCE INFO_1994-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:07:28 PM
Creation date
2/8/2022 3:11:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1994-2019
RECORD_ID
PR0515733
PE
4430
FACILITY_ID
FA0012311
FACILITY_NAME
BARBER RANCH
STREET_NUMBER
29247
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00111040
CURRENT_STATUS
01
SITE_LOCATION
29247 N THORNTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W arnat G6'OVC sewer Project Booster Pumps U%Ucm r', ge <br />Ow• Project Number: LIG-03.82 <br />Play 24, 2007 <br />excavation and refer to OSHA and Cal -OSHA standards to determine appropriate <br />methods to protect individuals working in excavations. <br />Backfill placed in trenches should be placed in approximately 8 inch lifts in uncompacted <br />thickness. However, thicker lifts may be used; provided the method of compaction is <br />approved by the soil engineer and the required minimum degree of compaction is <br />achieved. Material should be compacted to at least 90 percent of the maximum dry <br />density obtained by the ASTM D1557 test method. The upper 8 inches of trench <br />backfill within pavement areas should be compacted to at least 95 percent relative <br />compaction. <br />The recommendations of this report are based on the information provided regarding <br />the proposed construction as well as the subsoil conditions encountered at the test hole <br />locations. If the proposed construction is modified or re-sited, or if it is found during <br />construction that subsurface conditions differ from those described on the test hole <br />logs, the conclusions and recommendations of the report should be considered invalid <br />unless the changes are reviewed and the conclusions and recommendations modified or <br />approved in writing. <br />The analysis, conclusions and recommendations contained in this repor'i are based on <br />the site conditions as they existed at the time we drilled our test holes. It was assumed <br />that the test holes are representative of the subsurface conditions throughout the site. <br />If there is a substantial lapse of time between the submission of our report and the <br />start of the work at the site, or if conditions have changed due to natural causes or <br />construction operations at or adjacent to the site, we urge that our report be reviewed <br />to determine the applicability of the conclusions and recommendations considering the <br />changed conditions and time lapse. This report is applicable only for the project and <br />site studied. This report should not be used after 3 years, <br />Our professional services were performed, our findings obtained, and our <br />recommendations proposed in accordance with generally accepted engineering <br />principles and practices. This warranty is in lieu of all other warranties either expressed <br />or implied. Test findings and statements of professional opinion do not constitute a <br />guarantee or warranty, expressed or implied. <br />The. scope of our services did not include any environmental assessment or <br />investigation for the presence or absence of wetlands, hazardous or toxic materials in <br />the soil, surface water, groundwater or air, on or below or around this site. Any <br />statements in this report or on the soil logs regarding odors noted or unusual or <br />suspicious Items or conditions observed are strictly for the information of our client. <br />NAIL 0. ANDERSON <br />AND ASSOCIATCS <br />902 fuduea lot trapo i.odl, C.4 95240 <br />02007 Neil 0. Anderson & Associates. Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.