Laserfiche WebLink
V. Surface Condit s <br />A. Is site access adequately restricted? (Y/N) _ <br />B. Is the waste adequately covered to prevent human contact? <br />(Y/N) - yl _ <br />C. Is the final drainage system for the site adequate to prevent erosion? <br />(Y/N) <br />D. Is the final grading adequate to promote run-off? (Y/N) <br />E. Are slopes greater than 3:1 (33% or 18 degrees)? (Y/N)_ <br />F. Are slopes greater than 1.75:1 (57% or 30 degrees)? (Y/N) <br />V. Postclosure Land Use <br />A. Has the lad use of the site significantly changed since closure? <br />(Y/N) _ <br />If yes, include or reference site improvement plans and answer the following: <br />1. Give the date that the improvements were constructed <br />2. Have the improvements compromised the integrity of the final <br />cover? (Y/N/NA) <br />3. Has differential settlement affected the improvements? (Y/N) <br />B. Is there a proposed change in postclosure land use that may jeopardize <br />the integrity of previously closed sites or pose a potential threat to public <br />health and safety or the environment? (Y/N) <br />If yes, briefly describe the proposed project: <br />C. Is there a postclosure land use tracking system? (Y/N) <br />If yes, describe tracking system: <br />VI. Disposal Site Priority (See Prioritization Chart) <br />Al: A2:_A 3: B1:_13 2: B3: C1: C2: -!/—C 3: D: <br />VII. Comments <br />PREPARED BY: DATE: <br />COMPLIANCE BRANCH REVIEW: <br />CIWMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br />Page 4 of 4 <br />CIWMB Closure and Remediation Branch (1/25/93) <br />