Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> Site Address: Gavinko Petroleum 7700 MORELAND ROAD STOCKTON CA 95212 <br /> . . . . . .0 CAS.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . ATG . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X 2. . <br /> . . . . . . VEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5. . <br /> x 6. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . E-S P. . . . . . . . . . . . . . . . . . . . . . . <br /> X <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . 4. . . . . . . . . . . . . . . <br /> O 1. x 8. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . O O O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR <br /> . . . . .87. . . . . . . . . . . . . . . . . . . . F=FILLS <br /> *PIPING* T=TURBINE <br /> . . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) P=PROBE <br /> Drawing of piping V=VAPOR <br /> exit of sump and X=SUMP SENSOR <br /> O UDC's.No L=Leak Detector <br /> underground M=Manway <br /> . . . . . . x ESEL. . . . . . . . . . . . . . . . . . drawing is accurate, B=Brine Sensor <br /> . . . . . M we cannot I=Smart Sensor <br /> . . . . . . w . . . . . . . . . . . . . . . . . . . . . speculate blue S=STP <br /> prints. C=Floats&Chains <br /> . . . . . . . . . . . . . . . . . E=E Stop <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing <br /> not to scale <br /> Date map w-as drawn 8/31/20 <br /> Page 6 of 6 <br />