Laserfiche WebLink
soil/land surface, and/or transpiration by plants. However, in this particular case it is a suitable <br />approximation because of the size of the property in relation to the small wastewater volumes <br />that will be generated. An additional consideration is the site development plan that provides for <br />collection of runoff in three onsite retention basins; this will aid in achieving rainfall -recharge <br />volumes close to the average rainfall amount. No further analysis or response is required. I <br />recommend acceptance of the Nitrate Loading Study as submitted. <br />