Laserfiche WebLink
IT PIPING SPECIFICATIONS V. TESTING <br /> 1. THE SITE PLAN,PIPING PLAN AND THESE SPECIFICATIONS WILL GOVERN THE 12. TAPERING PIPE 1. CONSTRUCTION TESTING 4. AFTER POST CONSTRUCTION TESTING 10. REMOVE TANK PROMPTLY FROM PREMISES. <br /> EXACT LOCATION,NUMBER AND SIZE OF ALL UNDERGROUND PIPING AS WELL <br /> AS THE TYPE OF EQUIPMENT TO BE INSTALLED. REFER TO DETAIL DRAWINGS A. WHEN FRP PIPE IS CUT TO LENGTH ON THE JOB SITE,THE CUT END MUST A. TANKS A. THE IMPACT VALVE PLUG UNDER EACH DISPENSER SHALL BE 11. NO FIRE OR OPEN FLAME SHALL BE ALLOWED IN THE VICINITY AND ALL <br /> FOR INSTALLATION PROCEDURES TO BE FOLLOWED. NOTE:ALL REFERENCES BE RE-TAPERED. THE PATENTED FIELD TAPERING TOOL IS USED FOR SEALED WITH A WIRE SEAL THROUGH THE HOLE IN THE PLUG AND PRECAUTIONS SHALL BE OBSERVED DURING THIS ENTIRE PROCEDURE. <br /> TO VAPOR LINES ARE APPLICABLE ONLY TO COMMON HEADER SYSTEM FOR THIS PURPOSE. ADAPTABLE TO TWO,THREE,AND FOUR INCH PIPE,THE 1. VERIFY AND RECORD INTERSTITIAL VACUUM DOES NOT DEVIATE FROM UNUSABLE PRODUCT,SLUDGE AND TANKS SHALL BE DISPOSED OF IN <br /> VAPOR I,VAPOR II AND VENT,AND THOSE AREAS WHERE INDIVIDUAL VAPOR TOOL QUICKLY REAPPLIES THE PROPER TAPER BY A SHAVING FACTORY SUPPLIED VACUUM NOTATED ON SHIPPING DOCUMENTS PRIOR AROUND THE VALVE. QUICK CONNECT TEST FITTINGS CANNOT BE LEFT ACCORDANCE WITH ALL APPLICABLE FEDERAL,STATE,AND LOCAL <br /> PHASE I,PHASE II AND VENTS LINES ARE REQUIRED. NON STATE II AREAS DO OPERATION-SIMILAR TO A PENCIL SHARPENER. A STRAP WRENCH CAN TO UNLOADING/INSTALLING IN THE TANK HOLE. IN THE SHEAR VALVES. REGULATIONS. <br /> NOT REQUIRE STAGE II PIPING. BE USED WITH THE TOOL FOR HOLDING THE PIPE WHILE TAPERING. A <br /> VISE MAY ALSO BE USED FOR HOLDING. THE PIPE SHOULD BE FIRST 2. VERIFY AND RECORD INTERSTITIAL VACUUM DOES NOT DEVIATE FROM B. ALL HYDROSTATIC TEST WATER MUST BE DISPOSED OF PROPERLY. 12. TANKS THAT ARE NOT RETAINED BY OWNER SHALL BE JUNKED IN <br /> 2. REFER TO SECTIONS I.GENERAL,II.CONDITIONS AND III.SCOPE OF WORK OF WRAPPED WITH A PROTECTIVE MATERIAL TO AVOID GOUGING. FOR FACTORY SUPPLIED VACUUM NOTATED ON SHIPPING DOCUMENTS CONTACT LOVE'S ENVIRONMENTAL DEPT WITH ANY DISPOSAL ACCORDANCE WITH ALL APPLICABLE FEDERAL,STATE,AND LOCAL LAWS. <br /> THESE SPECIFICATIONS FOR INFORMATION AND CONDITIONS ALSO APPLICABLE PROPER TAPERING,CAREFULLY FOLLOW THE OPERATING INSTRUCTIONS PRIOR TO BACKFILL BEFORE JUNKING,THE TANK SHALL BE RE-TESTED FOR EXPLOSIVE VAPORS HARRISON FRENCH <br /> TO THE INSTALLATION OF PIPING(EXCEPT WHERE APPLICABLE TO TANKS ONLY). INCLUDED IN THE KIT. QUESTIONS. AND,IF NECESSARY,RENDERED GAS FREE. A SUFFICIENT NUMBER OF & ASSOCIATES , LTD <br /> 3. VERIFY AND RECORD INTERSTITIAL VACUUM DOES NOT DEVIATE FROM C. ALL SUMPS,UDCS,AND SPILL BUCKETS MUST BE CLEAN,DRY AND FREE HOLES OR OPENINGS SHALL THEN BE MADE IN IT TO RENDER IT UNFIT FOR <br /> FACTORY SUPPLIED VACUUM NOTATED ON SHIPPING DOCUMENTS FURTHER USE. CONTRACTOR SHALL SUBMIT A WRITTEN NOTARIZED <br /> 3. MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION AND OPERATIONAL B. POWER PIPE-THREADING MACHINES MAY BE USED IN THE TAPERING ONCE TANK HOLE IS BACKFILLED TO 90%. OF DEBRIS. CERTIFICATION,FOR EACH TANK REMOVED,WITH THE REMOVAL INVOICE 1705 S.Walton Blvd.,Suite 3 <br /> TESTING OF PUMPS,FILTERING SYSTEM,TANK GAUGING AND DISPENSERS OPERATION FOR FRP PIPE. FOLLOWING IS A GENERAL PROCEDURE FOR D. ALL TESTING DOCUMENTS MUST BE SUBMITTED TO THE LOVE'S THAT SAID TANK HAS BEEN SCRAPPED. Bentonville,Arkansas 72712 <br /> SHALL BE FOLLOWED TO AVOID POSSIBILITY OF DAMAGE TO EQUIPMENT. DOING THIS: 4. ANY VACUUM READINGS DEVIATING FROM SHIPPING DOCUMENTS MUST <br /> BE IMMEDIATELY REPORTED TO TANK MANUFACTURE AND LOVE'S ENVIRONMENTAL DEPARTMENT BY THE MONDAY PRIOR TO OPENING t 479.273.7780 <br /> 4. ALL INSTALLATIONS SHALL INCLUDE THE INSTALLATION OF AMERON DUALOY (1) WRAP A PROTECTIVE MATERIAL,SUCH AS EMERY CLOTH,RUBBER REPRESENTATIVE(DO NOT UNLOAD TANK FROM TRANSPORT OR UNLESS STATE OR LOCAL AUTHORITIES REQUIRE IT TO BE SUBMITTED IN f 888.520.9685 <br /> 3000 LCX.ALL VAPOR RECOVERY AND VENTING SYSTEMS SHALL BE SINGLE OR HEAVY CLOTH(CANVAS,ETC.,)AROUND THE PIPE WHERE THE INSTALL TANK IF VACUUM DEVIATES FROM FACTORY APPLIED VACUUM). w <br /> 13. OWNER WILL PROVIDE ALL GEOLOGY AND TESTING FOR TANK REMOVAL AND Nvw.hfa-ae.com <br /> WALL FRP PIPE,MANUFACTURED BY AMERON OR EQUAL(EXCEPT CALIFORNIA& STEEL VISE JAWS WILL ENGAGE. ADVANCE OF THIS DATE. WILL ARRANGE FOR DISPOSAL OF ANY CONTAMINATED SOIL. <br /> MARYLAND). ALL PIPING,RISERS,AND FITTINGS(EXCEPT FOR VALVES,BOOTS, 5. THE CONTRACTOR SHALL PERFORM A PRESSURE DROP TEST IN E. ALL TESTING OUTLINED IN 7.2 AND INSTALLATION CHECKLIST(NOTED <br /> AND STAINLESS STEEL FLEX CONNECTORS)ARE PROVIDED BY FUEL (2) POSITION THE PIPE SO THAT 14-INCHES OF PIPE EXTEND FROM THE THE VAPOR AND VENT LINES TO INSURE THAT THE LINES HAVE 14. CONTRACTOR SHALL STOCKPILE ANY CONTAMINATED SOIL ON BACK OF <br /> BEEN SLOPED PROPERLY,WITHOUT LEAKS,AND NO OBSTRUCTION BELOW)MUST BE SUBMITTED TO LOVE'S ENVIRONMENTAL DEPARTMENT o <br /> CONTRACTOR. VISE JAWS,THEN TIGHTEN THE JAWS UNTIL SNUG. SERVICE STATION LOT AND COVER WITH MEMBRANE AS DIRECTED BY w z w w <br /> THAT MAY IMPAIR THE OPERATION OF THE VAPOR RECOVERY BEFORE FINAL PAYMENT IS RELEASED. w m w m <br /> BALANCE SYSTEM. OWNER. W x¢0�z°0?U z <br /> (3) INSERT THE TAPERING TOOL MANDREL INTO THE PIPE. 1.TANK INSTALLATION CHECKLIST cn x S o a x oc <br /> 5. TRENCH EXCAVATION 15. CONTRACTOR SHALL COMPLETE BACKFILL AND COMPACTION OF VACATED wo¢ w v_z w ,w Z <br /> (4) WHEN TAPERING THE PIPE,OPERATE THE POWERED PIPE B. PIPING 2.LOVE'S NOV INSTALLATION CHECKLIST TANK HOLE AND FURNISH A CERTIFIED BACKFILL COMPACTION REPORT 90% � °w Uz=z o~w>w o 00 <br /> '-w�Z <br /> A. ALL TRENCHES SHALL BE EXCAVATED TO NEAT LINES AND SHALL BE OF THREADING MACHINE IN THE"REVERSE"DIRECTION ONLY. OR BETTER. EXCESS SOIL FROM NEW TANK HOLE CAN BE USED FOR THIS a o L w a a w z w <br /> 1. GENERAL CONTRACTOR SHALL GIVE REASONABLE ADVANCE NOTICE TO 3.JUNGE INSTALLATION CHECKLIST(IF APPLICABLE) Q'' s a�-~ow a w 5 o z R <br /> SUFFICIENT WIDTH,DEPTH AND ALIGNMENT AS TO PERMIT THE BACKFILL IF APPROVED BY OWNER. O w w>-w x x x 0 0 3 <br /> INSTALLATION OF DOUBLE WALL PIPING,FITTINGS,AND LAYING OF PIPES OWNER'S FIELD REPRESENTATIVE AND ANY OTHER REQUIRED LOCAL 4.METER CALIBRATION W s Q O w x w f o o w m a <br /> THEREIN OR OF INSTALLATION OF CONDUITS. (5) AT THE START,TAKE A LIGHT CUT AND THEN GRADUALLY INCREASE AUTHORITIES FOR THEIR INSPECTION OF THE UNDERGROUND TANK Z w w p a�w p w,wn q�¢w_ <br /> THE FEED RATE. INSTALLATION AND LINES PRIOR TO BACKFILLNG AND ALSO FOR THEIR 5.DEFENDER OPV INSTALLATION LIST O '>FDw N-F w w m it� <br /> PRESENCE DURING THE PRESSURE TESTING OF THE SYSTEM. 16. BACKFILL WITH THE STOCKPILED EXCAVATION MATERIAL AND/OR OTHER F_ 0 0 a N a x z a g w w o o <br /> B. THE DITCH SHALL BE EXCAVATED TO SLOPE FROM THE TANK HOLE AREAS Q z�0:-z�w w o z� <br /> (6) A TAPER LENGTH OF 1 1/2"MINIMUM IS NECESSARY. 6.BRAVO CERTIFICATION AND CHECKLIST(IF APPLICABLE) APPROVED NATIVE OR IMPORT SOILS. ALL BACKFILL SHOULD BE SPREAD, ��o 0 o a w f w w LA> <br /> UP TO THE DISPENSER OR VENT AREA(SLOPE 1/8"PER FOOT)AND ALLOW A 2. THE OWNER REPRESENTATIVE SHALL BE NOTIFIED TWENTY-FOUR HOURS 7.EVO INSTALLATION CHECKLIST WATERED,MIXED AND COMPACTED BY MECHANICAL MEANS IN APPROXIMATE x o_w o w a w O w w z <br /> 6"PEA GRAVEL BED BENEATH THE PIPING. 6-INCH THICK LIFTS. THE DEGREE OF COMPACTION OBTAINED SHOULD BE AT a �w x�0!w a z g q'� <br /> 13. HELPFUL HINTS FOR PIPING IN ADVANCE OF TESTS. <br /> T¢z�wQ�ooc�aoz <br /> C. PROVIDE A MINIMUM 24"PEA GRAVEL COVER OVER THE VENT LINES AND 8.ISO FUEL PANEL CHECKLIST LEAST 90 PERCENT OF THE ASTM-D-1557-78 LABORATORY TEST STANDARD. m o 0 0 0 o oo w x w c woo <br /> CONDUITS.TRENCH DIMENSIONS SHALL ALLOW FOR A 6-INCH PEA GRAVEL A. START AT TANK. REMOTE PUMP WILL CONNECT TO PIPING SYSTEM. 3. EACH PIPE SYSTEM SHALL BE FLUSHED CLEAN.TEST THE PRODUCT AND <br /> REFER TO DETAIL DRAWINGS FOR ADAPTER USED AT THE BEGINNING OF IF APPLICABLE TEST THE VAPOR PIPING BY ISOLATING THE LINES FROM <br /> ALL AROUND THE PIPES AND CONDUITS. ALL PIPE TRENCHES ARE TO BE PUMPS,DISPENSERS AND TANKS, THEN APPLY AN AIR PRESSURE OF 75 17. IMPORTED FILL MATERIALS SHOULD CONSIST OF CLEAN GRANULAR SOILS <br /> LINED WITH FILTER FABRIC-MIRAFI#160N GEOTEXTILE hoz.OR THE PIPE SYSTEM. PSI TO EACH PRIMARY LINE AND TEST ALL JOINTS FOR LEAKS THEN <br /> EQUIVALENT. APPLY NO MORE THAN 10 PSI TO EACH SECONDARY LINE AND TEST ALL VI, FILL BOXES, MANHOLE COVERS AND CONCRETE FREE FROM VEGETATION,DEBRIS,OR ROCKS LARGER THAN 3 INCHES. THE <br /> EXPANSION INDEX VALUE SHOULD NOT EXCEED A MAXIMUM OF 20 <br /> B. WHEN MAKING INSTALLATION,CUT AND TAPER ALL NECESSARY JOINTS JOINTS. (NON-EXPANSIVE). <br /> 6. IF PIPING WORK IS FOR REPLACEMENT AT EXISTING LOCATION,FOLLOW THESE BEFORE ASSEMBLY. 1. SET ALL GAUGE AND FILL BOXES,STREET BOXES OR MANHOLE COVERS ONE CD <br /> N <br /> ADDITIONAL GUIDELINES: 4. ALL PRIMARY AND SECONDARY PIPING SHALL BE TESTED BEFORE o <br /> C. ASSEMBLE ENTIRE SYSTEM WITHOUT ADHESIVE TO MAKE CERTAIN THAT BACKFILLING AND CONTINUOUSLY THEREAFTER UNTIL BACKFILL AND INCH ABOVE GRADE AND SLOPE PAVEMENT FROM RIM TO GRADE IN AN AREA 00 <br /> AS SHOWN IN DETAILS. SET EACH BOX OR MANHOLE IN MINIMUM 2'-6" 18. ALL EARTHWORK OPERATIONS SHOULD BE SUBJECT TO COMPACTION <br /> A. SURVEY THE SITE TO DETERMINE WHERE POSSIBLE,THE LOCATION OF EVERYTHING FITS. PAVING IS COMPLETED AND TEST IS ACCEPTED BY LOVE'S <br /> OTHER EXISTING UNDERGROUND FACILITIES SUCH AS SEWER LINES, REPRESENTATIVE. SQUARE BY 6"THICK CONCRETE IF IN OTHER THAN CONCRETE AREA. SLAB MONITORING OBSERVATION AND TESTING BY A SOILS ENGINEER. N <br /> WATER,CONDUITS ETC.,TO MINIMIZE DAMAGE DURING THE EXCAVATION AROUND STREET BOXES SHALL BE MINIMUM OF 4'-0"SQUARE. 1` <br /> D. GOOD"HOUSEKEEPING"IS ESSENTIAL IN INSTALLING FIBERGLASS (Y� o <br /> PROCESS. HAND DIG AREAS OF POTENTIAL DAMAGE. REINFORCED PIPE. ALL JOINTS SHOULD BE CLEAR OF GREASE AND 5. IF NO PERCEPTIBLE CHANGE IN PRESSURE HAS OCCURRED AT THE END <br /> EXCESSIVE MOISTURE TO ASSURE A PERMANENT BOND. JOINT CLEANER OF THE TEST PERIOD,THE SYSTEM SHALL BE CONSIDERED ACCEPTABLE 19. CONTRACTOR SHALL HAUL AWAY AND LEGALLY DISPOSE OF ALL EXCESS Q N W <br /> AND REMOVE CONCRETE AND PAVING WITHIN SAWCUT LINES. DISPOSE OF IS PROVIDED FOR THIS PURPOSE. SAND PARTICLES CAN BE A NUISANCE 3000 PSI(6 SACK MIX)28 DAY READY MIX WITH MAXIMUM 4"SLUMP. FINISH SOILS.BEFORE B. SAWCUT CLEAN AND SQUARE THE AREAS TO BE EXCAVATED. BREAK OUT BEFORE BACKFILLING, 2. ALL CONCRETE PROVIDED BY GENERAL CONTRACTOR SHALL BE 8"THICK, EXCAVATED MATERIALS,ASPHALT,AND CONCRETE AFTER OWNER CLEARS r CV <br /> ` m <br /> ON A WINDY DAY,WHEN ADHESIVE IS BEING APPLIED. <br /> ALL DEBRIS TO MINIMIZE INTERFERENCE. 6. NO PRODUCT SHALL BE INTRODUCED INTO THE LINES UNTIL AFTER SHALL BE WOOD FLOAT WITH A LIGHT BROOM FINISH. <br /> PAVEMENT IS INSTALLED OVER ALL FUEL LINES.LOCAL ORDINANCES ^ W J Z <br /> C. REMOVE ALL EXISTING UNDERGROUND PIPING,ATMOSPHERIC VENTS,AND AND REQUIREMENTS SHALL TAKE PRECEDENCE IF MORE SEVERE. ]X. MATERIALS PROVIDED BY OWNER OR CONTRACTOR z <br /> ALL THE EXISTING ELECTRICAL CONDUITS AND WIRES RELATED TO THE 14. PIPING SYSTEM-METALLIC O O w0 <br /> 3. PAINT THE MANHOLE AND COVER WITH A GOOD QUALITY WEATHER AND LU <br /> EXISTING FACILITIES. A. STEEL PIPE,WHERE SPECIFIED,ALL TANK FITTINGS,RISERS AND VENT 2. PRIOR TO POST CONSTRUCTION TESTING GASOLINE RESISTANT PAINT. 1. OWNER TO PROVIDE: 1 <br /> RISERS SHALL BE NEW BLACK IRON STEEL PIPE WITH MALLEABLE IRONN rw <br /> FITTINGS AND ALL UNIONS SHALL HAVE BRASS TO METAL GROUND JOINT A. PERCEPTIBLE WATER IN TANKS SHALL BE REMOVED BY THE CONTRACTOR A. FUEL DISPENSERS. 0L J <br /> 7. TRENCH BACKFILLING SEAT(250#UNIONS)(EXCEPT D.E.F). REMOVE BURRS FROM PIPE ENDS PRIOR TO RECEIVING FUEL INTO TANK. 4. INSTALL OWNER FURNISHED TANK I.D.MARKER AS SHOWN ON DRAWINGS. v^ E) <br /> AND REMOVE ALL FOREIGN MATTER FROM THE INSIDE BEFORE MARKERS EQ.TO E.B.W.787-100-03(DIESEL),E.B.W.787-100-09(UNLEADED), B. NEW FIBERGLASS UST. <br /> A. BED AND BACKFILLING MATERIAL SHALL BE PEA GRAVEL OR OTHER ASSEMBLING.UTILIZE GASOILA E SEAL FOR ALL THREADED B. TWENTY-FOUR HOURS BEFORE THE CONTRACTOR REQUIRES AND E.B.W.787-100-07(U/L PLUS) <br /> EQUIVALENT MATERIAL DESIGNATED BY THE OWNER ENGINEER. SIEVE CONNECTIONS EXCEPT D.E.F.UTILIZE GASOILA DEF.ALL BURIED STEEL <br /> DELIVERY OF PETROLEUM PRODUCTS FOR TESTING EQUIPMENT OR COMMON NAME(DIESEL,BIO,ETC.)LABEL WITH:TANK#(IN CONJUNCTION C. FUEL ISO PANEL. <br /> OWNER WITH TANK MONITOR)SENSOR#,METER#(BIO).T THE EO <br /> HALL RE <br /> HE TANKSREQUEST TIN <br /> R BALLASTING S, <br /> ANALYSIS ARE REQUIRED FOR ALL BACKFILL MATERIAL. PIPING SHALL BE COATED&WRAPPED.ALL TERMINATION FITTINGS FOD. NEW TANK SUMP EQUIPMENT AT DIESEL TANK. <br /> SHALL BE AMERON TERMINATION FITTINGS WITH THE VALVE STEM REPRESENTATIVE TO ARRANGE IT. <br /> B. REMOVE ALL CONSTRUCTION DEBRIS PRIOR TO DEPOSITION OF BACKFILL. POINTED IN THE 4 TO 8 O'CLOCK POSITION(UNLESS LOCAL FOLLOWING COLORS SHOULD BE USED: <br /> ION REQUIRES JURISDICTION VALVE STEMS TO BE LOCATED AT 6 O'CLOCK. C. TANKS CAN BE FILLED TO A MAXIMUM OF 75%OF CAPACITY AND THE <br /> REMOVE TIONSCHRE UVALVES FOR PROPER DRAINAGE AFTER TESTING. COMPARTMENTALIZED TANK MUST HAVE THE COMPARTMENTS FILLED TO PRODUCT: COLOR: 1. CONTRACTORS TO PROVIDE:(VERIFY WITH OWNER) Q <br /> C. BACKFILL MATERIAL SHALL BE PLACED IN THIN UNIFORM LAYERS AROUND THE SAME LEVEL AND CANNOT VARY MORE THAN THREE INCHES. <br /> UNLEADED WHITE CIRCLE A. ALL OTHER FUEL AND ELECTRICAL EQUIPMENT TO COMPLETE PROJECT. O <br /> AND OVER PIPING,VENT LINES OR CONDUITS AND THEN COMPACTED. D. THE SYSTEM MUST BE BLED OF AIR AND PRESSURE TESTED USING <br /> BACKFILL REQUIRED UNDER CONCRETE IN LOCATIONS WHERE HAND THE FUEL CONTRACTOR TO INSTALL STAINLESS STEEL(SS)PIPE ANY B. SUMP PIPING AND FITTING EQUIPMENT PER PLAN. <br /> WHERE DIESEL EXHAUST FLUID MAY HAVE CONTACT WITH METAL PIPING. GAUGES SUITABLE FOR GASOLINE/DIESEL/DEF SERVICE WITH A UNLEADED WITH ETHANOL WHITE CIRCLE WITH BLACK CROSS <br /> TAMPING IS NECESSARY,SHALL BE PLACED IN LAYERS NOT EXCEEDING SIX MAXIMUM READING OF 125 P.S.I.INSTALLED AT PLUGGED OPENING AND BLACK RING <br /> INCHES OF COMPACTED THICKNESS,MOISTENED AND HAND TAMPED WITH PROVIDED IN EACH DISPENSER. C. ALL FIBERGLASS FUEL PIPING AND FITTINGS PER PLAN. <br /> PNEUMATIC OR HAND TAMPERS WEIGHING NO LESS THAN 2-1/2 POUNDS B. METALLIC PIPE AND FITTING SPECIFICATIONS PREMIUM UNLEADED RED CIRCLE <br /> PER SQUARE INCH OF TAMPING AREA. THOROUGHLY TAMP ENTIRE AREA E. IF TANKS ARE BALLASTED WITH FUEL,WEEKLY LOGS OF THE TANK D. ALL OTHER PIPING MATERIAL. <br /> TO A DENSITY OF 90%MAXIMUM DENSITY. (1) PIPE: ALL PIPING SHALL BE MINIMUM SCHEDULE 40 WELDED INTERSTITIAL IS REQUIRED AND MUST BE SUBMITTED TO LOVE'S PREMIUM UNLEADED WITH ETHANOL RED CIRCLE WITH WHITE CROSS AND WHITE <br /> OR SEAMLESS STEEL PIPE PER ASTM A-53&ASTM-120 ENVIRONMENTAL DEPARTMENT ON THE MONDAY PRIOR TO OPENING. RING E. ALL DOUBLE-WALLED UDC SUMPS PER PLAN. <br /> D. ALL BACKFILLING OF ANY EXCAVATION SHALL BE DONE ONLY AFTER SPECIFICATION. <br /> F. THE SYSTEM SHALL BE COMPLETELY PURGED BY DISCHARGING MIDDLE GRADE BLUE CIRCLE F. ALL FUEL SENSOR AND MONITORING EQUIPMENT PER PLAN. o <br /> TESTING,REQUIRED INSPECTION AND APPROVAL HAVE BEEN OBTAINED <br /> FROM PROPER AUTHORITIES AND THE OWNER REPRESENTATIVE. (2) FITTINGS: ALL SCREWED FITTINGS SHALL BE BLACK IRON 300 LB PRODUCT THROUGH ALL DISPENSERS ON EACH PUMP, STARTING WITH <br /> MALLEABLE IRON PER SPECIFICATION ASTM A 197 THE MOST REMOTE DISPENSER, USING A SUITABLE HOSE MIDDLE GRADE WITH ETHANOL BLUE CIRCLE WITH WHITE CROSS AND G. ALL ELECTRICAL WIRE AND CONDUITS PER PLAN. <br /> AND DIMENSIONAL STANDARD ASA B 6-20 CONNECTED TO THE NOZZLE AND RETURN PURGED FUEL INTO THE WHITE RING <br /> APPROPRIATE TANK. PURGE A MINIMUM OF 500 GALLONS THROUGH H. ALL CONCRETE AND BACKFILL MATERIAL. <br /> E. BACKFILL OR FILL IN PLANTING AND UNIMPROVED AREAS,MAY BE EACH DISPENSER HOSE. OBSERVE THE GAUGE AND CONTINUOUSLY DIESEL YELLOW HEXAGON <br /> CONSOLIDATED BY PUDDLING WITH WATER. I. METAL PRODUCT PIPE FITTINGS IN FLOW PRODUCT UNTIL ALL EVIDENCE OF AIR DISAPPEARS. PURGED I. ALL OTHER MANHOLES AND SUMPS NEEDED AT TANK FIELD. <br /> UNDERGROUND DISPENSER CONTAINMENT DEF CANNOT BE RETURNED TO THE TANK OR DISPOSED OF IN THE OIL BIO-DIESEL BRONZE HEXAGON WITH YELLOW BORDER <br /> F. IN EXISTING OPERATING LOCATIONS,THE CONTRACTOR SHALL RESTORE SHALL BE STAINLESS STEEL(TEE AND ELBOWS) WATER SEPARATOR. J. ISLAND FORMS,HOOP BOLLARDS,AND CANOPY AREA EQUIPMENT TO <br /> TO ORIGINAL CONDITION THE AREAS DISTURBED BY TRENCHING AND COMPLETE PROJECT. <br /> REGRADE NATURAL AREAS AS REQUIRED TO MATCH EXISTING ELEVATIONS G. ONCE THE SYSTEM HAS BEEN PURGED THEN ALL FUEL METERS MUST BE DIESEL EXHAUST FLUID(D.E.F.) BLUE <br /> IN ORDER TO FACILITATE THE PROPER DRAINAGE OF THE SITE. (3) WRAPPING: CONTRACTOR SHALL TIGHTLY WRAP ALL METALLIC CALIBRATED,DOCUMENTED,AND WIRE CALIBRATION SEAL INSTALLED. VAPOR RECOVERY CONNECTION ORANGE CIRCLE <br /> PIPING SCHEDULED TO BE UNDERGROUND INCLUDING <br /> TANK RISERS,EXPOSED THREADS,UNIONS,SWING <br /> 8. PIPING INSTALLATION JOINTS,REMOTE VAPOR I,AND VENT FITTINGS IN THE 3. POST CONSTRUCTION TESTING AND TEST PROCEDURES <br /> FOLLOWING MANNER: VII EQUIPMENT <br /> A. ALL THE POST CONSTRUCTION TESTING MUST BE COMPLETED BY A <br /> THE PRODUCT AND VAPOR RECOVERY LINES SHALL BE PLACED INSIDE THE I. .THIRD PARTYOFESS <br /> ALL METALLIC PIPE AND FITTINGS(INCLUDING PR <br /> BEDDED TRENCH IN THEIR ENTIRE RUN FROM DISPENSERS TO TANKS. VENT 1. THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT AND MATERIALS NOT <br /> RISERS TO BE INSTALLED UNDERGROUND �,� N $ p� � <br /> LINES SHALL FOLLOW THE MOST DIRECT ROUTE TO THE TANKS(UNLESS A ) FURNISHED BY OWNER BUT NECESSARY FOR THE COMPLETION OF THE Q P, W <br /> SHALL BE COATED WITH"KOPPER'S BITUMASTIC B. TANK TIGHTNESS TEST-A 0.1 GPH PRECISION TANK TEST ON ENTIRE !v <br /> PIPING PLAN IS AVAILABLE)WITH A MINIMUM NUMBER OF BENDS AND SHALL BE PRIMARY TANK WET&ULLAGE IS REQUIRED. PROJECT. �' Ci <br /> 300M"COATING IN ACCORDANCE WITH ( ) <br /> CONTINUOUSLY PITCHED TO PROVIDE AN EVEN,MINIMUM DOWN SLOPE OF 1/8" O� �m <br /> PER FOOT FROM RISERS TO THE LOW POINT AT THE TANK CONNECTION. MANUFACTURER'S INSTRUCTIONS. REFER TO CHART TITLED"MATERIAL FURNISHED BY OWNER"FOR THE LIST OF W <br /> VAPOR RETURN MANIFOLD LINE(3-INCH DIA.)MUST SLOPE A MINIMUM OF 1/8" C. TANK SECONDARY CONTAINMENT TEST-PEI,INTERSTITIAL <br /> TANK). <br /> ,NK). (DRY 2 EQUIPMENT SCHEDULED TO BE FURNISHED BY OWNER. THE CHART ONLY M33 94 <br /> PER FOOT DOWN FROM DISPENSERS TOWARDS THE LOWEST GRADE GASOLINE INTERSTITIAL TANK) OR 4.3.9 (WET INTERSTITIAL TANK). <br /> DESCRIBES AND IDENTIFIES THE ITEMS PER MANUFACTURER. CORRELATE <br /> TANK FOR CONNECTION.BIO LINES(REMOTE FILL)SLOPED TOWARD THE DIESEL ii. REQUIRED-APPLY TWO(2)LAYERS OF 2-INCH THE SYMBOL NOMENCLATURE TO SYMBOLS SHOWN IN THE REFERENCE <br /> LINE TIGHTNESS TEST- PEI,RP100, 11.1.4. <br /> DROP TUBES. WIDE CORROSION PROTECTION TAPE 10 MIL. D. DRAWINGS. SEE THE SITE PLAN AND REFERENCE DRAWINGS FOR <br /> THICK,POLYKEN 940 OR SCOTCHWRAP 50-EACH QUANTITIES REQUIRED. HA NSG Q� <br /> LAYER SHALL BE SPIRAL WRAPPED WITH A 1-INCH E. HYDROSTATIC UDC AND SUMP TEST - PEI,RP1200, 6.5.6 OR 6.6. <br /> 9. PIPING SYSTEM-FRP(VAPOR,SYPHON,&VENT) OVERLAP. AT CONNECTIONS BETWEEN METALLIC (AT LEAST 4"ABOVE THE HIGHEST PENETRATION OR SIDEWALL SEAM, F CA�-W-O <br /> AND FRP PIPE,TAPE SHALL EXTEND 2-INCHES LOCAL REGULATION MAY REQUIRE MORE THAN 4".PAPERWORK MUST 3. OWNER MAY ELECT TO REQUEST THE CONTRACTOR TO FURNISH ALL OR <br /> MATERIALS ONTO FRP PIPE. TAPE SHALL BE CARRIED UP TO INCLUDE SUMP DEPTH,HIGHEST SIDEWALL TEST WATER DEPTH PART OF THE EQUIPMENT TO BE FURNISHED BY OWNER. SUCH ITEMS WILL 2020.05.20 10:44:46-05'00' <br /> THE BASE OF THE IMPACT VALVE AT DISPENSERS MEASURED TO WITHIN 1/16TH OF A INCH) BE LISTED IN THE CONTRACT DOCUMENT OR SITE PLAN. NO SUBSTITUTIONS <br /> A. ALL PRODUCT PIPING MUST BE DOUBLE WALL FRP WITH FITTINGS AND (EXCEPT FLEX CONNECTORS)AND UP THE 2-INCH WILL BE ALLOWED UNLESS APPROVED BY THE OWNER REPRESENTATIVE. <br /> BOOTS AS REQUIRED. VENT LINES FOR GASOLINE TANKS SHALL BE BLACK IRON COUPLING AT VENT LINES. F. HYDROSTATIC SPILL BUCKET - PEI, RP1200,6.2.5 <br /> DOUBLE WALL FRP PIPING.VENT LINES FOR DIESEL AND(D.E.F.)SHALL <br /> BE SINGLE WALL FRP PIPING. G. PIPING ANNULAR TEST(ALL SECONDARY PIPING IS REQUIRED TO BE VIII. REMOVAL OR ABANDONMENT OF UNDERGROUND TANKS <br /> B. BLACK IRON PIPE AT DIESEL SUCTION LINE. SEE SHEET F-8. TESTED INCLUDING SYPHON LINES AND VENT PIPING IF APPLICABLE)- <br /> REQUIRED -NO STREET ELLS AND"THREAD" PEI,RP1200, 5.7. 1. BEFORE UNCOVERING OR DISCONNECTING AN UNDERGROUND PETROLEUM <br /> NIPPLES SHALL BE USED.PIPELINES SHALL BE STORAGE TANK,THE CONTENTS SHALL BE PUMPED OUT AS COMPLETELY AS <br /> C. UNDERGROUND VAPOR&VENT PIPING AND FITTINGS SHALL BE FRP. PLACED IN STRAIGHT RUNS.WHEN USING PIPE H. LINE LEAK DETECTOR FUNCTIONALITY(ATG PRINT OUTS SHOWING LD POSSIBLE BY USING A HAND PUMP WITH SUCTION HOSE OR PIPE EXTENDED <br /> FITTINGS,THREADS SHALL BE CLEAN,FULL GOING INTO LINE FULL)-TEST PEI,RPI 200,9.2.6. TO TANK BOTTOM THROUGH FILL PIPE. <br /> LENGTH,COATED WITH PETROLEUM RESISTANT <br /> D. PIPE AND FITTINGS SHALL MEET ALL DIMENSIONAL AND PERFORMANCE THREAD SEALANT(GASOILA E SEAL),THEN <br /> REQUIREMENTS,MECHANICAL PROPERTIES AND SHALL BE MARKED WITH TIGHTENED TO REFUSAL. I. OVERFILL ALARM FUNCTIONALITY TEST PEI,RP1200,and 7.3.3. <br /> A U.L.LABEL FOR NON-METALLIC UNDERGROUND PIPING FOR 2. ALL PRODUCT REMOVED FROM TANK AND PIPE LINES SHALL BE PLACED IN <br /> PETROLEUM PRODUCTS. J. OVERFILL VALVE FUNCTIONALITY INSPECTION - PEI,RP1200,7.3.3. SUITABLE CONTAINERS. USABLE PRODUCT SHALL BE TRANSFERRED TO <br /> STORAGE DESIGNATED BY THE OWNER OF THE PRODUCT. UNUSABLE ISSUE BLOCK <br /> E. WORKING PRESSURE LIMIT FOR PIPING SHALL BE IN ACCORDANCE WITH K. SENSOR FUNCTIONALITY TEST(ATG PRINT OUTS SHALL SHOW SENSORS PRODUCT AND TANK RESIDUE SHALL BE SAFELY DISPOSED OF IN <br /> MANUFACTURER'S REQUIREMENTS. ]V. DISPENSER INSTALLATION GOING IN ADN OUT OF ALARM AND MUST ACCOMPANY TEST FORM) - ACCORDANCE WITH GOVERNING AIR,WATER,AND SOLID WASTE <br /> PEI, RP1200, 8.3.6. REGULATORS. <br /> 0 <br /> U F. ULTIMATE SHEAR STRENGTH OF ADHESIVE AND CURING AGENT SHALL <br /> LU O_ BE PER PIPE MANUFACTURER'S REQUIREMENTS. 1. DEEP SUMPS MUST BE INSTALLED IN THE DISPENSER CORE HOLES FOR L. SHEAR VALVE FUNCTIONALITY TEST - PEI,RP1200,10.2.5. 3. AFTER UNCOVERING TANK,DISCONNECT ALL PIPING AND PLUG TANK <br /> U COLLECTION OF LIQUIDS AND GRAVITY DRAINAGE INTO THE DOUBLE WALL OPENINGS. LEAVE ONE OPENING TO SERVE AS VENT. DRAIN ALL <br /> PRODUCT PIPING. LIQUIDS WILL EVENTUALLY MIGRATE TO THE TURBINE M. STAGE 1 VAPOR RECOVERY(PRESSURE DECAY AND P/V VENT CAP DISCONNECTED PIPING INTO SUITABLE CONTAINERS AND PLUG THE OPEN <br /> c� G. ALL UNDERGROUND PIPING SHALL BE IN ACCORDANCE WITH NFPA No.30 PUMP CONTAINMENT SUMP AND SET OFF THE MONITORING SENSOR IN THAT <br /> LL AND ALL APPLICABLE LOCAL CODES. SUMPTESTS) - CARB TP 201.1E AND TP201.3. ENDS OF ALL PIPE THAT WILL NOT BE REMOVED OR REUSED. <br /> . <br /> p� N. STAGE 2 VAPOR RECOVERY(IF APPLICABLE)-ANY APPLICABLE TEST 4. REMOVAL OF TANKS SHALL BE IN COMPLIANCE WITH ALL GOVERNING <br /> 02. DISPENSERS SHALL BE INSTALLED LEVEL AND ANCHORED TO CONCRETE REQUIRED BY THE LOCAL AIR DISTRICT AGENCIES SUCH AS FIRE DEPARTMENTS,AQMD,HEALTH DEPARTMENTS,EPA. <br /> 10. PRODUCT PIPING HANDLING AND STORAGE PUMP ISLANDS WITH A STEEL ANCHORAGE BOX(FURNISHED WITH <br /> REFER TO MANUFACTURER'S CURRENT INSTALLATION MANUALS. DISPENSER SUMP UNLESS OTHERWISE SPECIFIED BY THE OWNER O. TESTING IS NOT LIMITED TO TESTS AND PROCEDURES NOTED ABOVE- 5. CONTRACTOR SHALL INCLUDE TRIPLE RINSING OF EXISTING TANKS,PROVIDE <br /> LL REPRESENTATIVE). VERIFY LOCAL TESTING REQUIREMENTS. MARINE CHEMIST,AND COMPLETE VAPOR ABATEMENT. <br /> 11. SPECIAL INSTRUCTIONS FOR FRP PIPING: (VERY IMPORTANT) <br /> 3. FURNISH AND INSTALL A 2"SLOTTED FRP PIPE AND A LIQUID DETECTOR TO BE 6. CONTRACTOR SHALL PROVIDE OWNER REPRESENTATIVE WITH: STORE NO. 223 <br /> CONNECTED TO THE MONITORING DETECTION SYSTEM. <br /> A. IT IS REQUIRED THAT THE FUEL CONTRACTOR BE A CERTIFIED A. COPY OF TANK WASH RINSING MANIFEST <br /> LL INSTALLER OF FRP PIPING AND HAVE ON SITE THE CURRENT DOCUMENT DATE: 04.15.20 <br /> o MANUFACTURER'S INSTALLATION MANUALS,BULLETINS AND LITERATURE 4. DISPENSER CORE HOLES AND SUMPS SHALL BE LEFT EMPTY OF BACKFILL <br /> N PERTAINING TO FRP PIPE. FOR INSPECTION AND MAINTENANCE.KEEP DISPENSER SHIPPING CARTONS B. COPY OF MARINE CHEMIST CERTIFICATE(IF REQUIRED) <br /> CONTRACTOR SHALL STRICTLY ADHERE TO MANUFACTURER'S OVER DISPENSERS FOR PROTECTION. CHECKED BY: BKH <br /> C. COPY OF VAPOR ABATEMENT CERTIFICATE <br /> RECOMMENDED PROCEDURES FOR INSTALLATION. NO DEVIATION FROM DRAWN BY: WWB <br /> THESE SPECIFICATIONS WILL BE ALLOWED. D. COPY OF TANK DISPOSITION <br /> 5. INSTALL AND ADJUST ALL SWIVELS,HOSES,AND NOZZLES. <br /> ami LL ch PROTO CYCLE: 01.01.20 <br /> E N B. SPECIAL CARE SHALL BE TAKEN TO PREVENT THE INTERMIXING OF 7. ALTERNATE PURGING METHODS MUST BE APPROVED BY GOVERNING <br /> m Q STONES,DIRT CLODS OR OTHER DEBRIS WITH THE CLEAN PEA STONE 6. INSTALL OWNER PROVIDED DOOR BOLTS TO TRUCK ISLAND DISPENSERS AUTHORITIES AND OWNER REPRESENTATIVE. <br /> � U AROUND THE PIPE. AND INTERIOR SECURITY UPPER DOOR SHIELDS <br /> ac C. BY REFERRING TO MECHANICAL DRAWINGS,CONTRACTOR SHALL 8. AFTER REMOVAL,ROLL TANK TO OPENING UP POSITION AND PURGE BY SPECIFICATIONS, <br /> 3 .Q PERMIT NO STAKES BEING DRIVEN IN THE VICINITY OF ANY FRP 7. INSTALL OWNER PROVIDED PULSER COVERS TO TRUCK ISLAND DISPENSERS ADDING 2 POUNDS PER 100 GALLONS TANK CAPACITY,EVENLY DISTRIBUTED MATERIAL, <br /> `- UNDERGROUND PIPING. OVER TANK BOTTOM. WHEN VAPORS STOP FLOWING,PLUG ALL OPENINGS. <br /> Z) aa) 8. UNPLUG MANAGERS KEYPAD TO ALL DISPENSERS EQUIPMENT <br /> > D. ALL PIPE RUNS SHALL HAVE DETECTABLE TRACER TAPE INSTALLED. <br /> E 0 9. AFTER TANK IS RAISED,IT SHALL NOT BE LEFT UNATTENDED UNTIL REMOVED. (SHEET Z) <br /> 9. DISPENSER INSTALLERS SHALL RE-CALIBRATE DISPENSER 60 DAYS AFTER <br /> IF THERE IS ANY EVIDENCE OF A LEAK OR UNDERGROUND PETROLEUM IN <br /> � N OPENING OF STORE. THE TANK HOLE WHICH BECOMES APPARENT WHEN THE TANK IS RAISED,ANY <br /> •• o <br /> 00 00 REPORTING OR OTHER ACTION REQUIRED BY FEDERAL,STATE OR LOCAL <br /> N O <br /> LAW MUST BE TAKEN. FURTHERMORE,THE APPROPRIATE OWNER OFFICE <br /> o c,4 SHOULD BE INFORMED OF THE EVIDENCE OF A LEAK OR UNDERGROUND <br /> 0 o PETROLEUM BEFORE THE HOLE IS BACKFILLED. SHEET: <br /> �Q F-3 <br /> Q <br />