Laserfiche WebLink
8"TANK SLAB MIN, <br /> -gm, <br /> HARRISON FRENCH <br /> & As S O C1 A T E S , L T D <br /> Suite 3 <br /> d <br /> vBl ., <br /> IF TANK EXCAVATION IS APT TO FILL WITH WATER FROM ANY SOURCE,TANK IS TO BE Bentonville,1705 S.Walton BlArkavd., <br /> 72712 <br /> BALLASTED WITH CLEAN WATER. AT NO TIME IS BALLAST WATER LEVEL IN TANK PEA GRAVEL t 479.273.7780 <br /> TO EXCEED LEVEL OF WATER(OR BACKFILL) IN TANK EXCAVATION. AFTER U.G. FUEL TANK f 888.520.7785 <br /> INSTALLATION,ALL WATER IS TO BE REMOVED BY PUMPING WITH SUCTION HOSE AT (TYP) <br /> LOW END OF TANK. AFTER WATER IS REMOVED, CIRCULATE DRY COMPRESSED AIR Nvww.hfa-ae.com <br /> THROUGH TANK OPENINGS TO DRY TANK INTERIOR. ALL TANK OPENINGS MUST BE <br /> LEFT OPEN DURING THIS DRYING OPERATION. CONTRACTOR MUST PROVIDE FIBERGLASS HOLDDOWN <br /> STRAPS Uj <br /> CERTIFICATION THAT THE TANK WAS DRIED COMPLETELY AND IS CLEAN. DO NOT � W Uj- m <br /> USE TURBINE PUMP TO EMPTY WATER IN TANK. o �n z W w o <br /> D w 0 H­,2 0 0 0 w=Q <br /> W O O H W>W O O <br /> 2'-0" <'0LwmoaW20aN <br /> PROVIDE AN ALTERNATE PRICE (No. 2)TO PROVIDE&INSTALL DEADMEN W!i-z,j a W x XT 0003: <br /> z <br /> ANCHORS TO ALL UNDERGROUND FUEL TANKS&OIL-WATER SEPARATOR Z a¢ Z w w N w a <br /> nw a� w <br /> O nZN�P:W-Zmw WE T� <br /> H c��aNaEza�2www <br /> Z w 0 4 z H W W J o Z H <br /> J a LU U a o O W�J W U' F y <br /> ATTACHMENT LINK a ouaiwou)QWwwwzw� <br /> �w0��'aDO, <br /> �az�wQfr000 OZ <br /> W Ho000�0iiaawnau <br /> TURNBUCKLE <br /> O <br /> N <br /> O <br /> 017 <br /> O <br /> O <br /> Cl <br /> M <br /> N O <br /> 12"PEA GRAVEL Q N LLI <br /> m <br /> C *k z m <br /> Z LULLI <br /> J Z <br /> O � LLJ <br /> (2)#6 CONT. O U <br /> 0 <br /> TYPICAL <br /> L3'-0"---- <br /> y <br /> 12"PEA GRAVEL BED 2 18"CONCRETE DEADMAN <br /> BETWEEN ANY TWO <br /> FILTER FABRIC ADJACENT TANKS Q <br /> LINER O <br /> DEADMEN / ANCHORING INSTALLATION GENERAL NOTES: <br /> 1. CONTRACTOR IS TO INSTALL DEADMEN IN SUCH A MANNER 1. TANK ANCHORING SHALL BE INSTALLED ONLY WHEN <br /> AS TO NOT REQUIRE PERSONNEL IN THE BOTTOM OF THE APPROVED BY OWNER AND AS REQUIRED <br /> EXCAVATION. THESE INSTALLATIONS ARE INTENDED TO BE BY LOCAL AGENCIES. IT IS RECOMMENDED THAT o <br /> ONLY A GUIDE. CONTRACTOR MUST COMPLY WITH ALL TANKS BE ANCHORED FOR INSTALLATIONS WHERE <br /> APPLICABLE OSHA OR CAL/OSHA REGULATIONS. GROUND WATER IS LESS THAN 16 FEET BELOW GRADE. <br /> O O �� 2. CONCRETE DEADMEN SHALL BE PRECAST ABOVE GRADE WITH 2. FOR HOLD-DOWN STRAP LOCATIONS, REFER TO0 O <br /> O O O ANCHOR RODS IN PLACE, ON CENTERS(AS SHOWN), A MINIMUM DETAIL HEREON. <br /> OF 7 DAYS PRIOR TO INSTALLATION. <br /> 03. 3,000 AND/OR 550(IF APP)GALLON OIL-WATER SEPARATOR TANK, WHEN 0013. PROPERLY POSITION DEADMEN IN THE HOLE(ON TOP OF INSTALLED,TO BE ANCHORED PER MANUFACTURER'S <br /> O O F PEA GRAVEL)PRIOR TO ANY BACKFILL.. SPECIFICATIONS. <br /> ST ` �0 4. PLACE A 12"THICK BED OF PEA GRAVEL AND GRADE SMOOTH. <br /> Vos"TING <br /> O 5. SET TANKS ON PEA GRAVEL BED. REQUIRING ANCHORING. (ALL WET HOLE CONDITIONS) <br /> o <br /> O O I� 6. BACKFILL TO CENTERLINE OF TANKS.o NOTE: QROFESSIO <br /> O O O O I O GENERAL CONTRACTOR TO 7. POSITION ANCHOR STRAPS AND ATTACH TO ANCHOR RODS. <br /> VERIFY NUMBER OF REQUIRED <br /> TIGHTEN TO OBTAIN A SNUG FIT. <br /> o OBSERVATION WELLS AND 8. BACKFILL TO TOP OF TANK. <br /> BACK OF CURB <br /> ADDITIONAL REQUIREMENTS <br /> O MATCH EXISTING WITH AUTHORITY HAVING M 094 <br /> O CONDITION JURISDICTION. DO NOT INSTALL STANDARD TANK SECTION <br /> OBSERVATION WELL IN DRIVE <br /> AREAS. NOT TO SCALEOCF CA to�0 <br /> A <br /> 0 0 0 0 FRONT OF CURB FF-306 <br /> MATCH EXISTING OBSERVATION WELL <br /> 2020.05.20 10:43:45-05'00' <br /> CONDITION MANHOLE <br /> O <br /> cy, OP-117 HOLDDOWN STRAP <br /> O ATG OBSERVATION WELL PROVIDED BY OWNER <br /> ANNULAR <br /> PROBE O MANHOLE <br /> Q <br /> H <br /> w <br /> 0 <br /> 8"TANK REINFORCED <br /> p 8"TANK REINFORCED-------_____. CONCRETE SLAB ISSUE BLOCK <br /> EXISTING BUILDING <br /> U CONCRETE SLAB <br /> z <br /> Q <br /> Y SLOPE SLAB CONCRETE SLOPE SLAB CONCRETE ATTACHMENT LINK <br /> Q OUT V-0"-MANHOLE OUT V-0"-MANHOLE PROVIDED BY OWNER <br /> ~ RAISED 1"ABOVE FINISHED RAISED 1"ABOVE FINISHED <br /> GRADE ANNULAR OO O O GRADE <br /> LL JAW&JAW <br /> EXISTING ELECTRICAL ATG OR JAW&EYE TURNBUCKLE <br /> TRANSFORMER PROBE FF-300 BY FUEL CONTRACTOR <br /> OBSERVATION WELL <br /> Ui O MANHOLE <br /> m EX TO CONC.SLAB <br /> G CON OR DEADMAN ANCHOR <br /> IST IN V STORE NO. 223 <br /> LL ,X` 1 FF-300 <br /> DOCUMENT DATE: 04.15.20 <br /> ATG OO O \ U /PROBE MANHOLE <br /> WELL <br /> ANNULAR <br /> � CHECKED BY: BKH <br /> � I <br /> NOTE: TIGHTEN STRAPS <br /> E <br /> UNIFORMLY FOR EVEN DRAWN BY: WWB <br /> (n w DISTRIBUTED LOAD TO TANK <br /> a) N PROTO CYCLE: 01.01.20 <br /> 04 <br /> Q a a <br /> • ,_,_,_,_._,_._,_._,_._._,_._,_._,_._,_,_,_,_,_,_,_. , ,_,_,_,_,_,_._,_._,_._,_._,_._,_._,_._,_._,_._._._._._._._._, TANK <br /> 3 4" CONCRETE AREA ANCHORING <br /> NEW SECTION OF FENCE 8"TANK REINFORCED FOR OBSERVATION WELL AND TANK SLAB <br /> > MATCH EXISTING MATERIAL CONCRETE SLAB OVER DETAIL <br /> E USTs I <br /> C) N <br /> O <br /> 00 <br /> cq NEW TANK SLAB DETAIL TURNBUCKLE ATTACHMENT <br /> cq <br /> N - NOT TO SCALE NOT TO SCALE SHEET: <br /> F- 13 <br /> z <br />