Laserfiche WebLink
I. PHASING OF PROJECT <br />Phase Time Period Activity <br />I Spring, 1987 Subdivision CQnStructinn <br />A. GENERAL <br />1. Size of Project Area 32 acres- <br />2. Average Slope: 0-58 —X, 6-108 , 11-20%_, more than 208 <br />3. Uses (structures, crops, etc.) SeatonaL Crop <br />4. Uses in the Immediate Vicinity <br />North Agricultural -Sesonal Crops South Residential (Mobile Home Park) <br />East_ Residential (Eagle Park) West Interstate Highway 5 <br />5. Property Description (shape, terrain, unique features, etc.) <br />See attached maP. <br />6. Specify waterways or irrigation on property or continguous <br />property <br />None known <br />7. Specify any easements or utility rights-of-way None known <br />B. ENVIRONMENT <br />1. Vegetation on site (oaks, riparian vegetation, etc.) Seasonal <br />r.rnpq Fallow <br />2. Rare or endangered animals or plants None <br />3. Subject to flooding, poor drainage, or other natural hazard <br />4. Historic or archaeological resources, scenic aspects, or sand <br />or gravel resources None <br />-5- <br />Plan -44 <br />(9/85) <br />