My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHTH
>
717
>
2300 - Underground Storage Tank Program
>
PR0522448
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2023 8:36:23 AM
Creation date
2/11/2022 2:54:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0522448
PE
2371
FACILITY_ID
FA0015274
FACILITY_NAME
KESAR PETROLEUM INC
STREET_NUMBER
717
Direction
W
STREET_NAME
EIGHTH
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16314045
CURRENT_STATUS
01
SITE_LOCATION
717 W EIGHTH ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Overfill Prevention Equipment Inspection Report <br />Tank ID (one OPE per column) Super Reg DSL <br />Are both vent and tank riser piping secondarily <br />contained? <br />X Yes <br />No <br />X Yes <br />No <br />X Yes <br />No <br />iii Yes <br />No <br />OPE Model <br />What is the OPE response when activated? <br />(Check all that apply.) <br />Shut off <br />Flow <br />Restricts <br />Flow <br />X Audible <br />Alarm <br />X Visual <br />Alarm <br />Shut off <br />Flow <br />Restricts <br />Flow <br />X Audible <br />Alarm <br />X Visual <br />Alarm <br />Shut off <br />Flow <br />Restricts <br />Flow <br />X Audible <br />Alarm <br />X Visual <br />Alarm <br />Shut off <br />Flow <br />Restricts <br />Flow <br />Audible <br />Alarm <br />Visual <br />Alarm <br />Are flow restrictors installed on vent piping that <br />may interfere with the OPE operation? <br />Yes* <br />X No <br />Yes* <br />X No <br />Yes* <br />X No <br />Yes* <br />No <br />At what level in the tank is the OPE set to <br />activate? (Inches from bottom of tank) 98" 98" 98" <br />What is the percent capacity of the tank at <br />which the OPE activates? 90% 90% 90% <br />Is the OPE in proper operating condition to <br />respond when the stored substance reaches the <br />designated regulatory level? <br />X Yes <br />No <br />X Yes <br />No <br />X Yes <br />No <br />Yes <br />No <br />7. SUMMARY OF TESTING RESULTS <br />OPE Inspection Results X Pass <br />s Fail <br />X Pass <br />Fail <br />X Pass <br />Fail <br />Pass <br />Fail <br />8. COMMENTS <br />Describe all results marked "Fail" and each proposed remedy. <br />Note regular tank is 20,000. Super is 8000. Diesel 11849 simultaneous overfill cannot take place due to <br />one product is drop at one time. <br />* Mark here if: <br />Flow restrictors interfere with overfill prevention and equipment repairs required. <br />Additional copies of this page may be attached. <br />Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br />Page 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.