Laserfiche WebLink
1 (a) Plan revision; <br /> 2 (b) Public notification process; <br /> 3 (c) Information repository ; <br /> 4 (d) Public meetings. <br /> 5 (4) Sampling Plan <br /> 6 The sampling plan must be capable of developing <br /> 7 a complete profile of on-site and off-site air, l <br /> 8 <br /> soil, surface water and groundwater <br /> 9 contamination attributable to releases and <br /> 10 potential releases at the Site. The sampling <br /> 11 plan shall also provide documentation that a <br /> 12 statistically sufficient number of sampling <br /> 13 sites have been selected and analyzed. <br /> 14 (a) Soil Sampling Program <br /> 15 (i) Site map showing location and depths <br /> 16 <br /> of all proposed soil sampling; <br /> 17 (ii) Justification and rationale for <br /> 18 soil sample locations, depths, and <br /> 19 contaminants to be analyzed; <br /> 20 A description of provisions for <br /> 21 gaining access to and obtaining <br />- 22 samples from adjacent properties,- <br /> 23 where appropriate; <br /> 24 (iv) Sampling equipment and procedures; <br /> 25 <br /> (v) Project specific analytical <br /> 26 techniques, QA/QC methods and <br /> 27 health and safety procedures. <br /> -16- z <br /> COURT FAFZR <br /> OTATt CFCAL'Fell"' <br /> STD. 113 1"CV. 6-711 <br />