Laserfiche WebLink
i <br /> 1 construction, sampling, frequency, <br /> and contaminants to be analyzed; <br /> 2 <br /> �! (vii) Sampling equipment and procedures; <br /> 3 '. <br /> 4 <br /> (viii) Project specific analytical <br /> techniques, QA/QC methods and i <br /> 5 <br /> 6 health and safety procedures. <br /> 7 (c) Surface Water Runoff <br /> i <br /> $ (i) Assessment of potential for <br /> contamination of surface runoff; <br /> 9 <br /> 10 Surface water runoff and related <br /> 11 soils sampling plan. <br /> I <br /> 12 (d) A description of how the data obtained I <br /> 13 will be managed and preserved. <br /> 14 <br /> (5) Remedial Investigation (RI) Workplan <br /> - � <br /> { <br /> 15 Implementation: <br /> 16 (a) The Remedial Investigation Report portion <br /> 17 of the Workplan shall describe the steps <br /> 18 necessary to submit this report in <br /> compliance with paragraph 5.3.4 . <br /> 19 <br /> 20 (b) The Feasibility Study portion of the <br /> 21 Workplan shall include a plan for providing <br /> at least the following elements in the <br /> 22 <br /> 23 Feasibility Study: <br /> 24 (i) A summary of the existing and <br /> 25 potential hazards for which <br /> corrective action is required; <br /> 26 <br /> 27 (ii) A description of the alternative <br /> -18- <br /> (COURT PAPIER <br /> INTATS OF CALIFORNIA <br /> &To. 113 Illcv. 6.711 <br />