Laserfiche WebLink
C <br /> 1 General Requirements: <br /> 2 1 . Closure Plan; <br /> 3 " a. Waste inventory ; <br /> 41 i) Specify the maximum inventory of waste associated <br /> 5 with the surface impoundment, and when determined <br /> 61i.il I through sampling and analysis, the quantity of <br /> 7 sludge and the quantity of most highly <br /> 8 contaminated soil . <br /> 9 ii) Identify the off-site disposal facility authorized <br /> 10 by EPA to receive the involved waste. The <br /> ill transport distances and the methods to be used to <br /> 12 secure the waste during transport shall also be <br /> 13 identified. <br /> 14 b. Waste Identification; <br /> 15 i) Identify by EPA identification number, all <br /> 16 hazardous wastes used or handled on site and the <br /> 17 quantity of sludge which is in the pond. <br /> i <br /> 18 ii) List the sample parameters to be analyzed and the <br /> I <br /> 19 analysis methods (EPA or equivalent) to be used. <br /> 20 C. Cost Estimation; <br /> 21 i) Review the cost estimates and update them as <br /> 22 - required. <br /> 23 ii) A contingency cost percentage shall be included as <br /> 24 a safety factor. <br /> 25 d. Decontamination; <br /> 26 <br /> 27 <br /> E-3 <br /> COURT PAPER <br /> STATt OF CALIFORNIA <br /> STD. 111 111[V. •-721 <br /> 85 34 MG <br />