My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2200 - Hazardous Waste Program
>
PR0513594
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 4:23:59 PM
Creation date
2/14/2022 12:48:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0513594
PE
2229
FACILITY_ID
FA0007670
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
15902010
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
361
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 livestock, wildlife or the environment. Treatment <br /> 2 technologies and short and long-term costs shall <br /> 3 be considered. The effects of remediating the <br /> 411 <br /> surface impoundment separately from the rest of <br /> 5i the Site shall be discussed in the analysis. Any <br /> 6 �I removals shall be verified by confirmation <br /> 7 sampling. If any contamination remains on Site, <br /> i <br /> g Respondent shall positively demonstrate that <br /> g vertical and lateral migration will be prevented. i <br /> 10 d. Department, EPA and the CVRWQCB shall be provided <br /> I <br /> I <br /> 11 a copy of all plans, designs and specifications <br /> 12 for the interim corrective actions and the <br /> 13 , closure/post-closure. Department approval shall <br /> i <br /> 14 be required prior to the start of field activities. 1 <br /> P <br /> 15 <br /> e. Respondent shall meet the financial assurance and i <br /> 16 � <br /> liability requirements, based on the final <br /> 17 closure/post-closure methodology, and shall submit <br /> 18 a revised letter from the Chief Financial Officer. <br /> 19 f. Respondent shall develop a comprehensive Health <br /> 20 and Safety Plan to address the health and safety <br /> 21 considerations for corrective actions and <br /> 22 closure/post-closure activities.- This plan shall <br /> 23 be discussed in the closure and post-closure plan, <br /> 24 and shall be submitted as a part of the RAP. The <br /> 25 plan shall address personnel protection training, <br /> 26 <br /> 27 <br /> E-7 <br /> COURT PAPIR <br /> /TATS OF CALIFORNIA j <br /> STIo. 113 IMSV. 0•711 <br /> 86 34760 <br />
The URL can be used to link to this page
Your browser does not support the video tag.