Laserfiche WebLink
CAUTION:This email is originated from outside of the organization. Do not click links or open attachments unless you recognize <br /> the sender and know the content is safe. <br /> Good morning Kristina, <br /> I never saw a reply to Kari Casey regarding specific elements that may need to be included in the plan. Please confirm <br /> status of our return to compliance. Are there any outstanding documents or items that need to be complete to satisfy <br /> our return to compliance? I believe we should be current. <br /> Thank you, <br /> Paul Hamilton <br /> Director of Operations and Safety <br /> CALIFORNIA FREIGHT <br /> 209.599.5024 direct/fax <br /> phamilton@calfreight.com <br /> From: Kari Casey<karicasev@whfinc.com> <br /> Sent:Thursday, March 31, 2022 2:15 PM <br /> To: Saetern, Kristina Gaen [EHD] <ksaetern@s6gov.org> <br /> Cc: Paul Hamilton <phamilton@calfreight.com>; Manzo, Elena K. [EHD] <emanzo@slgoy.org> <br /> Subject: Re: California Freight 805 S locust <br /> Hi Kristina, <br /> We prepare these plans using a consolidated format from OES so yes it contains more than what is required than just <br /> the SPCC, it covers multiple CUPA required plans. However, all of the plan requirements for the SPCC are <br /> included. Specifically Part 8 of the plan covers the SPCC requirements,the engineering certification (section 8.1.1) is <br /> on page 42, and page 45 includes a cross reference table (section 8.1.6) that covers where all the SPCC requirements <br /> 11 <br />