My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
141
>
2300 - Underground Storage Tank Program
>
PR0543574
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 9:11:47 AM
Creation date
2/15/2022 9:44:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0543574
PE
2351
FACILITY_ID
FA0024750
FACILITY_NAME
Harney Lane 76
STREET_NUMBER
141
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
141 E HARNEY LN
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHKB ® 4 2022 <br /> 1 . Site map enclosed ? YE3K NO [ ] ENVIRONMENTAL HEALTH <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer trainiQW49MENTeach <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component , describe how this will be done . ( If <br /> adding piping , UDC ' s , or other UST equipment , or performing tank top upgrade , use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review) : <br /> Remove currently installed 87 , 91 and DSL drop tubes . Build and install new drop tubes according <br /> to tank charts and regulation . Test with county upon completion . <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third -party approval ) : <br /> OPW drop tubes <br /> EH230038 (revised 12- 11 - 15) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.