My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOOD
>
5655
>
2200 - Hazardous Waste Program
>
PR0541208
>
COMPLIANCE INFO_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2022 10:02:26 AM
Creation date
2/15/2022 11:29:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2022
RECORD_ID
PR0541208
PE
2247
FACILITY_ID
FA0023065
FACILITY_NAME
FedEx Ground - Tracy
STREET_NUMBER
5655
STREET_NAME
HOOD
STREET_TYPE
Way
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
5655 Hood Way
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Adobe Captivate Thursday, January 20, 2022 <br /> Slide 13 - Hazardous Waste Contingency Plan <br /> Hazardous Waste Contingency Plan (Hubs only) <br /> e procedures necessary to respond <br /> When:Annual review by December 31 st <br /> L A <br /> Who must prepare:FXG Hubs issued all 1 ID Number <br /> R. M Office, <br /> Central Control,and FA <br /> Continue <br /> Slide notes <br /> FedEx Ground hubs must develop and implement a hazardous waste contingency plan. <br /> The contingency plan outlines the procedures necessary to respond to <br /> and minimize hazards to human health and the environment from fires,explosions or any unplanned release of materials identified as hazardous waste. <br /> Instructions on how to prepare the Hazardous Waste Contingency Plan for your facility <br /> are available on the Environmental Affairs SharePoint site. <br /> The Contingency Plan is to be reviewed by the hub manager and emergency coordinators annually for completeness and accuracy. <br /> The annual review should be completed by December 31 st,documented on Attachment 4, <br /> the Annual Hazardous Waste Contingency Plan Review Checklist,and sent to Environmental Affairs Department. <br /> Copies of the hazardous waste contingency plan must be maintained in the main office, <br /> central control(if applicable),and the HMPA. <br /> Page 22 of 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.