Laserfiche WebLink
The following is an itemized list of RCRA hazardous waste violations that have not <br /> been addressed for METAL FINISHING SOLUTIONS - STOCKTON CA as of <br /> January 26, 2022. <br /> Open violations from July 20, 2021 inspection <br /> Violation#303-Failed to maintain all communication or alarm systems,spill control,or decontamination <br /> equipment. <br /> OBSERVATION: The emergency eye wash station, located next to the processing line,did not have sufficient water <br /> pressure when operated. <br /> REGULATION GUIDANCE:All facility communications or alarm systems,fire protection equipment, spill control <br /> equipment, and decontamination equipment,where required, shall be tested and maintained as necessary to assure <br /> its proper operation in time of emergency. <br /> CORRECTIVE ACTION: Bring the emergency eye wash station into proper working order by repair, replacement or <br /> testing. Provide a corrective action statement to the San Joaquin County Environmental Health Department within <br /> 30 days. <br /> -------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> ----------------------------------------------------------------- <br /> OBSERVATION: <br /> 1. The processing line secondary containment contained solids and liquids with pH 1.5. <br /> 2. The treatment system secondary containment contained solids. <br /> REGULATION GUIDANCE:All facility spill control equipment shall be maintained as necessary to assure its proper <br /> operation in time of emergency. <br /> CORRECTIVE ACTION: Bring the processing line and treatment system secondary containments into proper <br /> working order by removing the liquid and solids in the secondary containments and placing in the proper waste <br /> container. Provide a corrective action statement to the San Joaquin County Environmental Health Department <br /> within 30 days. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 6 of 8 <br />