My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2022
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
4600
>
2300 - Underground Storage Tank Program
>
PR0547496
>
INSTALL_2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2023 4:28:46 PM
Creation date
2/17/2022 9:06:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2022
RECORD_ID
PR0547496
PE
2351
FACILITY_ID
FA0027003
FACILITY_NAME
VALLEY FUELS INC
STREET_NUMBER
4600
Direction
S
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
24402031
CURRENT_STATUS
01
SITE_LOCATION
4600 S CORRAL HOLLOW RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/h1 BRAVO <br />6500 Serie <br />PROBLEM SDLVEO Singlewall and Doublewa <br />Product Showa <br />B5Q1-S <br />About the B500 Series <br />Bravo's 8500 Series Singlewall and Doublewall <br />transition sumps are compatible with all common <br />motor fuels and can be ordered with standard AST <br />fittings pre-installed. The fittings range from <br />electrical offset (EO) to 3" compression pass-through <br />AST fittings. This series comes standard with positive <br />concrete anchoring and mounting points for optional <br />rack system. <br />Bravo Solution Center <br />Call or Text (323) 541-3851 <br />SIZES <br />• Small 25.5" <br />• Large 41.5" <br />*See page 2 for dimension drawing and dimension chart <br />MATERIAL <br />• Fiberglass <br />• Epoxy coated galvannealed steel <br />SPECIFICATIONS <br />Quality FRP construction, no need for gelcoat <br />for chemical resistance <br />"Planter" style raised lid to keep surface water <br />out <br />Accommodates up to 5 factory installed AST <br />fittings depending on model <br />Factory mounting points make a rack system <br />installation simple <br />19 30 -year corrosion warranty <br />UL2447 listed <br />Doublewall construction can be monitored with <br />vacuum or hydrostatically making it triennial <br />testing exempt with continuous monitoring <br />orders@sbravo.com 0 Ships under a continuous 20" Hg vacuum test <br />
The URL can be used to link to this page
Your browser does not support the video tag.