Laserfiche WebLink
Grounding • Bonding • • • Comments/Recommendations <br /> Are the Tanks Grounded And/Or Bonded <br /> Properly? es <br /> Other <br /> Stairways-Handrails-Platforms-Ladders' Observations Comments/Recommendations <br /> Stairways-Handrails-Platforms-Ladders Ladded Fair condition. Some paint failure and surface corrosion <br /> here paint failure has occurred.'* <br /> Other <br /> Observations5.0 External Shell <br /> External Coatings <br /> Tank External Coating Paint <br /> External Coating Condition lGood Some paint failure.**** <br /> Other <br /> ObservationsShell <br /> Condition Of Welds Good <br /> Corrosion es Some surface corrosion where paint failure has <br /> occurred.***' <br /> Evidence of Distortion No <br /> Mechanical Damage No <br /> Evidence of Leaks No <br /> Repads or Changes to Original Design? No <br /> Other <br /> InsulationObservations . • •. <br /> Insulation Missing? N/A <br /> Evidence of Moisture? N/A <br /> Evidence of Mold? N/A <br /> Damage to Insulation? N/A <br /> Corrosion Under Insulation? N/A <br /> Other <br /> Tank Roof Observations Comments/Recommendations <br /> Standing Water(low areas)? N/A <br /> Coating Failure? Yes Isome paint failure on top of tank.**** <br /> Other <br /> 6.0 Next Scheduled Formal Inspection <br /> Comments <br /> Category 1: <br /> The tank is equipped with spill control and/or CRDM (continuous release detection method) <br /> and is considered a Category 1 tank per table 5.5 of STI SP001.The next formal external <br /> Formal Inspection Is Required in (years): inspection would be required in 20 years or as required by the sites SPCC Plan.The <br /> inspection schedule is based on the site completing the recommended repairs as noted in <br /> he inspection report. If problems are identified during periodic inspections a formal <br /> inspection may be required sooner. The condition of the equipment may change after the <br /> issuance of this report. <br /> Other <br /> 7 <br />