Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared: <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> U ST Monitoring site Plan <br /> Site Address: «-FSTL—N-E FUEL 3300IVESTL.C\E STOCK-TON CA 95204 <br /> )CE <br /> =11.`tPr m"Sensor <br /> F=FILLS <br /> V=VAPOR <br /> P=PROBE <br /> L=Turbine Leak Detector <br /> X=SUI EP SENSOR <br /> B=Brine Sensor <br /> S=Smart Sensor <br /> C=Floats&Chain.; <br /> E=E Stop <br /> . tplpL'1C+ <br /> PV UENI (ARROWS <br /> Drawing of pipui_ <br /> exit of sump and b <br /> underground <br /> . dranmg is accurate <br /> _ wmot >,e <br /> S 3 J 0 speculate blue <br /> pI1�5 <br /> . . . . . . . . . _ . . . . . . . . . . . . . . . . . . _ . . . . . . . <br /> 87 91 c . _ .I C <br /> TL C <br /> P F A �' F P Eil C <br /> s; <br /> WESTLANE <br /> 4M-frena rrrd"-oraii rhar are na irsible to the cergAtng rechrrictan are a <br /> p�essranlopraonor{ arrlaesdehjair/ormrtiomlprnprz� Raring <br /> not to scda <br /> Date map was drawn:7127121 <br /> Instructions <br /> If you already have a diagram that shows all required information.you may include it rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps.dispenser pans,spill containers,or other secondary containment areas:mechanical of electronic line leak detectors;and in-tank liquid level <br /> probes(d used for leak detection). In the spare provided,note the date this Site Plan was prepared. <br /> Page 6 of 6 <br />