Laserfiche WebLink
<br /> <br />Page 6 of 6 <br />10. MONITORING SITE PLAN <br />Date site plan was prepared: <br />If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br />identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br />a legend for all symbols depicted. <br /> <br /> <br />UST Monitoring Site Map <br /> <br />Site Address: 322 S. Center Street, Stockton, CA 95203 <br /> <br /> <br /> <br /> <br />DRIVE <br />THRU <br /> <br /> <br /> <br /> <br /> <br /> <br /> Front Entrance Service Window <br /> <br /> <br /> <br />A = Annular <br />F = Fill <br />V = Vapor <br />L = Turbine / Leak Detector <br />X = Sensor Location <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 12 11 6 5 4 3 <br /> <br /> <br /> <br /> <br /> <br /> <br /> 87 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 10 9 8 7 2 1 <br /> <br /> <br /> <br /> VENTS <br /> <br /> <br /> <br /> <br /> <br /> <br />DATE SITE MAP DRAWN: <br /> <br /> <br /> <br /> <br /> <br /> <br /> KEY <br />A = ANNULAR Sensor <br />F = FILLS <br />V = VAPOR <br />P = PROBE <br />L = Turbine / Leak Detector <br />X = SUMP SENSOR <br />B = Brine Sensor <br />S = Smart Sensor <br />C = Floats & Chains <br />E = E Stop <br />*PIPING * <br /> (ARROWS) <br />Drawing of piping exit of <br />sump and UDC’s. No <br />underground drawing is <br />accurate, we cannot <br />speculate blue prints. <br />McDonalds ATG in Back Room <br /> <br />C. Store <br /> <br /> <br /> <br />X <br /> <br /> <br /> <br />X <br /> <br /> <br /> <br />X <br /> <br /> <br /> <br />X <br /> <br /> <br /> <br />X <br /> <br /> <br /> <br /> <br /> X <br />L <br />P <br />V <br />F <br />A <br /> <br /> <br /> X <br />P <br />V <br />F <br />A <br /> <br /> <br /> <br />X <br />CAS <br />91 <br />87