My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14720
>
2600 - Land Use Program
>
S-81-11
>
SU0014580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 2:01:51 PM
Creation date
2/24/2022 1:38:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014580
PE
2600
FACILITY_NAME
S-81-11
STREET_NUMBER
14720
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
APN
05516031
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
14720 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The proposed site for the overland flow system is adjusted wetted area is 30 ha (74 acres). The non- <br /> on a hillside next to a river. As shown in Figure 11, wetted area needed for buildings, access roads and <br /> the eastern half of the site has a general slope of 4% buffer zones would add another 10 ha based on the <br /> while the slope of the western half is 8%. The length assumption that the wetted area is 75%of the sum <br /> of each terrace is assumed to be 50 m (160 ft). From of wetted and non-wetted areas (Aly et al. 1979). <br /> eq 16, The area needed for a storage pond is estimated <br /> to be 20.0 ha. This estimate is based on a storage <br /> _ 0.078 50 volume of 667,750 m3 which includes 567,750 m3 <br /> Q (0.04)1/3 60 for storing wastewater and 100,000 m3 for storing <br /> precipitation during winter. The storage needed for <br /> =0.190 m' hr' for the 4%slope wastewater was calculated by multiplying the design <br /> flow (3785 m' day') by the number of storage <br /> and days (150 days, November thru March). The depth <br /> of the storage pond was assumed to be 3.5 m. Summing <br /> _ 0.078 (50 the wetted, non-wetted and storage pond areas, the <br /> 9 (0.08)1/3 60 total area of the overland flow facility is 60 ha (148 <br /> acres). A possible configuration of the terraces for <br /> =0.151 m' hr' m' for the 8%slope. this overland flow system is shown in Figure 12. <br /> With an application season of 28 weeks per year COMPARISON WITH THE TRADITIONAL <br /> (April through October) and an application cycle of DESIGN APPROACH <br /> 10 hours daily for 5 days per week, the annual <br /> operating time is 1400 hrs. Also, the runoff coeffic- <br /> ient calculated from eq 17 is 0.8. The annual appli- As indicated earlier in this report the traditional <br /> cation rate Qa to each terrace can now be calculated design procedure is to calculate the wetted area <br /> from eq 15: based solely on hydraulic loading rate. For an over- <br /> land flow system receiving primary or pond effluent, <br /> _ (0.190 the procedure is to select a hydraulic loading ranging <br /> Qa — \0 8 1400 from 6.4 to 20 cm/wk. Using the same design flow <br /> and application season as in the previous design ex- <br /> 332.5 m3 yr' rn' for the 4%slope ample,the required wetted area would range from <br /> 27 to 85 ha. Recall that the wetted area predicted <br /> _`0.151\ by the rational procedure presented in this report <br /> Qa— 0 8 f 1400 was 27 ha,which is the least amount of land pre- <br /> dicted by the traditional approach. Therefore a <br /> = 264.3 m3 yr' m' for the 8%slope. system designed according to the traditional procedure <br /> will require more land,especially if the designer se- <br /> lf the annual design flow is 1.38 x 106 m' and leets a conservative loading rate. For example, it <br /> the precipitation minus evaporation volume from would be reasonable to assume that the designer <br /> the holding pond is 0.15 x 106 m3, the total water would choose a loading rate in the middle of the <br /> volume applied to the overland flow site is 1.53 x 106 range. For a hydraulic loading rate of 15 cm/wk, <br /> m3 yr'. If this volume is divided equally, the waste- the land area required would be approximately 40 <br /> water applied to each half of the site is 0.77 x 106 ha or 501/6 greater than that required by the rational <br /> m3 yr'. With an annual application rate of 332.5 procedure. In this case the cost of a traditionally <br /> m3 yr' m', the total width of terrace needed on designed system would be about 50%higher. <br /> the 4%slope is 2,316 m. Likewise, the total width Beyond the monetary benefits just described, the <br /> of terrace needed on the 8%slope is 2,913 m. If rational procedure presented here is based on the <br /> the length of each terrace is 50 m then the combined fundamental process design concept of detention <br /> wetted area needed for treatment is 27 ha (67 acres). time. This concept is familiar to most designers, <br /> Additional wetted area will be needed to handle which makes overland flow more appealing as a <br /> wastewater flows during harvest operations. If three treatment alternative. Also, this procedure allows <br /> harvests per year and a drying period of one week the designer to tailor each site according to existing <br /> per harvest are planned, the wetted area should be site conditions and discharge requirements. <br /> increased by 11% (3 wks/28 wks)..Therefore the <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.