My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014580
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
14720
>
2600 - Land Use Program
>
S-81-11
>
SU0014580
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 2:01:51 PM
Creation date
2/24/2022 1:38:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014580
PE
2600
FACILITY_NAME
S-81-11
STREET_NUMBER
14720
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
APN
05516031
ENTERED_DATE
12/9/2021 12:00:00 AM
SITE_LOCATION
14720 N THORNTON RD
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN CONCEPT - DOMESTIC FIRE AND WATER <br /> The following numbers are my best estimate at this time and subject to final <br /> approval at final design. <br /> 1 . Full Development - Domestic Demand <br /> GPD <br /> 6 Acres - Motel 7,-500 <br /> 5 Acres - RV Parking 7:500 <br /> 21 Acres - Highway Service (Commercial ) 40,000 <br /> 3 Acres - Restaurants 18,000 <br /> Daily Demand 73,000 <br /> Assume 50% in 4 Hours = 9,125 GPH <br /> 150 GPM <br /> Assume a peaking factor of 2 = 300 GPM <br /> 2. Full Development - Fire Demand <br /> Since there is no fire district, all buildings except small isolated <br /> structures waived by Fire Marshall , shall have sprinklers. <br /> Realizing that a sprinkler demand cannot be set without a building <br /> design, I assume a demand of 850 GPM. <br /> For full development the project will have two wells capable of provid- <br /> ing 300 GPM @ 60 PSI , or 1 ,000 GPM (150 + 850) @ 25 PSI. <br /> A generator will be provided to run one well and the treatment plant. <br /> 3. First Phase - See Exhibit 2 <br /> Can we install one well without generator and bond the second well ? <br /> Any addition to the first phase will require the construction of the <br /> second well and generator that will also supply the treatment plant <br /> with power. <br /> This is not a residential subdivision with a large or foreseeably large <br /> water demand. Can the normal requirement of a 10,000 gallon pressure <br /> tank be waived to another size based upon engineering design? <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.