Laserfiche WebLink
,11. Please include a copy of any studies (soils, geology, marketing, <br />etc.) that you may have had prepared for this project or project <br />site. SOILS study attached.,,4t,,...:,4. <br />F " <br />C. PROJECT CHARACTERISTICS <br />1. Services: Indicate how the following services will be provided <br />for your project and availability of service. <br />See Tentative Map for <br />a. Water Supply: Public Water System CSA 31 - wall 1nrat;ons <br />b. Sewage Disposal: Treatment plant SA 31- Sep Addendum <br />C. Storm Drainage: Terminal Drainage CSA 31 - S Tentative Mn; <br />If an extension of any of the above is necessary, indicate <br />which service(s), what agency will be providing the <br />service(s), and the distance of the extension(s): <br />Services to be dedicated to CSA 31 for Maintenance <br />d. Natural Gas: P. G. & E. <br />e. Electricity: P. G. & E. <br />f. Road/Access (i.e., paved, unpaved, public/private, road name): <br />Public Roads to be dedicated to the County <br />g. Fire: Nnrth neper Distance to nearest fire station: 1 Mile <br />h. Schools: Lodi Unified School District. <br />2. Describe any site alterations which result from the proposed pro- <br />ject (specifically address the amount and location of grading, <br />cuts and fills, vegetation removal, alterations to drainage, <br />removal of existing structures, number of trees removed, etc.). <br />Minimal Grading -- See Tentative Map for dry lake to be filled <br />and location of scrubb trees. <br />3. Air Quality Information: <br />Number and type of vehicles associated with completed project <br />Passenger vehicles <br />Types of emissions and sources associated with project <br />Automobile emissions <br />Fuel sources (and amounts) to be consumed by or as a result of the <br />completed project & NafjirAi Gas to ha d terminad <br />based on a mix of permitted users in tha znna <br />Will the project result in substantial air emissions or deteriora- <br />tion of ambient air quality? la_NO _ YES <br />4. How much agricultural land will be removed from production? <br />NONE <br />Irrigated Not irrigated <br />Major Subdivision - 9 - (6/86) <br />