Laserfiche WebLink
( It 3 ClnAA1 PAA 6/h.ems/ix.7 <br /> Site: <br /> Appendix B Date: (D(IJf-�j <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet Tank ID Tester DW <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion (AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> (D)= <br /> ti <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of lower tube,valve length. <br /> (w)= z )6 v V Upper <br /> (U) _ 140 16U Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note: If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61TP models add 0.6") (W)Valve <br /> (6)= `y, "I Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%volume. (B) <br /> (Y)=/fir �r� ��� To Tank <br /> (Y) <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) Length, 100% <br /> (X) =(B) —(D)-2"_ Aw ij-- / y top of cut Volume i <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X)dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons=AD�_ 1 JV <br /> (Y)tank capacity in gallons= � <br /> SO%_ (X)capacity/(Y) capacity x100=�y'L 9 9y2_ <br /> Note: The overfill valve must be installed per AM require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />