Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ® Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-Regular 87 2-Super 91 3-Diesel <br /> Tank Manufacturer Trusco Trusco Trusco <br /> Tank Capacity 12K 6K 6K <br /> Test Start Time 9:40 9:50 9:50 <br /> Initial Reading -10" Hg. -10" Hg. -10" Hg. <br /> Test End Time 10:40 10:50 10:50 <br /> Final Reading -10" Hg. -10" Hg. -10" Hg. <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail 1 ® Pass ❑ Fail 1 ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ® Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-Regular 87 2-Super 91 3-Diesel <br /> Pipe Manufacturer FGS Red Thd. FGS Red Thd. FGS Red Thd. <br /> Test Start Time 9:45 10:20 9:55 <br /> Initial Reading 3 Psi 3 Psi 3 Psi <br /> Test End Time 10:45 11:20 10:55 <br /> Final Reading 3 Psi 3 Psi 3 Psi <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />