Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> FGS Red Thd.=Fiberglass Systems Red Thread. PS=Piping Sump. <br /> Western FG=Western Fiberglass. BP=Bottom Penetrations. <br /> Note: Tank #2 Super 91 and Tank #3 Diesel is a 12K two compartment. Tank #1 is designated for <br /> 6K Super 91 Octane Gasoline. Tank #3 is designated for 6K Diesel. Tank #2 and Tank #3 have a <br /> common Tank Secondary Containment. <br /> Note: Replaced Test Boot on Super 91 Secondary Pipe at Piping Sump, prior to testing. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />